Regency L676S-NG1 installation manual Finishing, Non-combustible, Material

Page 12

INSTALLATION

FINISHING

INSTALLATION

NON-COMBUSTIBLE REQUIREMENTS

 

 

 

44-1/2"

Metal

 

 

 

 

Stud

 

 

 

 

(1130mm)

 

 

 

 

 

 

15-9/16"

(392mm)

 

Non-combustible

 

 

 

Material

 

 

 

 

 

 

 

 

combustible Material -Non

31-5/8"

combustible Material -Non

47-5/8" (1209mm)

32-1/16”

(814mm)

(803mm)

29-1/16” (738mm)

 

 

 

Non-combustible Material

 

 

 

 

6-7/16"

Finished Floor

3"

 

 

(163mm)

 

 

(76mm)

Diagram 1

Note: All non-combustible facing material should butt up cleanly to the flanges around the firebox opening.

Rough edges may be visible, from an angle, through the 1/2" gap behind the faceplate.

To obtain a clean edge, facing material edges may be finished with a J-style trim or metal cornerbead (both materials available at your local building or hardware outlet) see diagram 2.

Important: Materials used must be NON-COMBUSTIBLE

1)Finishing material such as tile, river rock, etc. must not protrude beyond the front facing flanges on all 4 sides of the firebox opening.

2) If material such as brick, stone, etc. extends past the faceplate depth, when finishing around the faceplate, the minimum opening dimension noted below (Diagram 3) must be adhered to - to ensure the faceplate can be removed.

36 -1/4”

34-9/16”

Diagram 3

Important:

A3/4" gap must be maintained all around the outer edge of the faceplate and the edge of any finishing material thicker than 1-1/4" (see diagram 4).

This gap is required to facilitate the installation of the faceplate and to ensure the removal of the faceplate for service access.

3/4"

Finishing Material

(thickness + 1-1/4")

Diagram 4

Diagram 2

12

Regency® L676S Direct Vent Gas Fireplace

Image 12
Contents L676 Sunrise Gas Fireplace Manufactured Mobile Home Requirements Information for MOBILE/MANUFACTURED Homes After First SaleTable of Contents Safety Label Copy of Safety DecalSerial No. / No de serie Factory Equipped For Altitude 0-4500ft -1372mRequirements For the State of Massachusetts onlyUnit Dimensions Installation General Safety InformationInstallation Checklist Important Message Save These InstructionsManufactured Mobile Home Additional Requirements Heat Release KITFinished Floor Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesInstalled. See Diagram 3 for details FramingImportant Header must be metal stud. All other framing may FramingFinishing Non-combustibleMaterial + 3/8 + 3/4Unit Assembly Prior to Installation Finishing TemplateVenting Introduction No adjustment required Vent Restrictor PositionVent Restrictor Plate Latch Latch Location HingeDoorExterior Vent Termination Requirements Minimum Clearance RequirementsCanada1 Venting Arrangements Horizontal Termination FlexRigid Pipe Venting Systems Basic Horizontal & Vertical Terminations8 Rigid Pipe Cross Reference Chart Installation Allowable Horizontal Terminations Vent Restrictor On SetVertical Vent Restrictor On Set Option + H1 Option + V1 H + H1Option + H1 V + V1 With these options, max. totalAllowable Vertical Terminations Unit Installation with Horizontal Termination Unit Installation With Vertical Termination This allows for small adjustmentsDiagram Minimum VentUnit Installation Astrocap XLPilot Adjustment GAS Line InstallationGAS Pipe Pressure Testing High ElevationAeration Adjustment Wiring DiagramMinimum Air Shutter Opening OptionalConversion KIT #526-969 from NG to LP LP Conversion Kit Contains Qty DescriptionLeaks Panel Installation Stainless Steel Panels Black Enamel PanelsFirebox base Slots on fl oor of fi rebox baseHoles on bottom Panel Left panelUse this hole on panel clip Spread the supplied Glass Crystals or optional Ceramic Spa Faceplate & Door Frame Installation Adjustment for fi nishing materialsLevel adjustment Location of mounting bracketsOperating Instructions For Your Safety Read Before Lighting Normal Operating Sounds GAS AppliancesCopy of Lighting Plate Instructions Lighting InstructionsMaintenance DC Spark BOX Battery Replacement DC Spark BOX ReplacementDC Spark Box Wires DC Spark Box LocationValve Tray Replacement Door Hinge with door removedSlots for back panel Disconnect 2 wires DC Spark Box Electrode WireLocation of Screws Disconnect 2 generator wires Valve Tray OutParts List Main AssemblyHeat Wave Kit Release Kit Burner Assembly Regency L676S Direct Vent Gas Fireplace Regency L676S Direct Vent Gas Fireplace Warranty ConditionsInstaller Please complete the following information