Regency Assembly Steps, Installing STAND-OFFS, SET the Regency FP90 Into Position

Page 13

INSTALLATION

ASSEMBLY STEPS

Note: The following steps represent the normal sequence of installation. Each installation is unique, however, and might require different steps. Each step is dealt with in detail in the following pages.

1)Install stand-offs and insulation strip to the unit. See Installing the Stand-offs section on this page.

There is also 1" unit base standoffs that are supplied with the unit. These are optional and are to be used to raise the unit. The thickness of the finished hearth will dictate the height of the stove. Please be careful to ensure that the bottom louver will open when unit is installed with the fi nished hearth.

IMPORTANT: It is absolutely necessary to attach stand-offs to the unit to avoid combustion problems. Serious overheatingofcombustibleframingand possible fire may result if stand-offs are not properly installed.

The fi replace may be installed directly on a combustible fl oor or raised on a platform of an appropriate height. Do not place fi replace on carpeting, vinyl or other soft fl oor coverings. It may, however, be placed on fl at wood, plywood, particle board or other hard surfaces. Be sure the fi replace rests on a solid continuous fl oor or platform for support and to prevent cold air from entering the room from under the fi replace, if against an outside wall.

The fi replace may be positioned and then the framing built around it, or the framing may be constructed and the fi replace positioned into the opening.

2)Complete framing and installation of nailing strips for the FP90.

IMPORTANT: Remove gold accessories such as louvers while installing to avoid marking.

Position fi rebox prior to framing or into prepared framing.

3)Install the Chimney System.

4)Install Outside Combustion Air Kit .

5)Hook-up the Wiring.

6)Install the Blower.

7)Gravity Air Feed Option.

8)Complete fi nish wall material, surround and hearth extension to your individual taste.

9)Position vermiculite liner/bricks and ceramic fi ber insulation in the unit. Attach louvers, glass, doors, handles.

INSTALLING THE

STAND-OFFS

Stand-offs are installed to provide reduced temperatures and proper clearances for the safe installation of your product. They consist of four 3" (76mm) stand-offs on the back, two 3" (76mm) stand-offs on each side and one 8" (203mm) stand-off on the top of the unit.

Attach these stand-offs where indicated in the pre-drilled holes on the unit body.

IMPORTANT: Under no circumstances can the fireplace top or side spacers be removed or modified. Do not notch the header to be installed closer than the fireplace outside facing spacers.

IMPORTANT:Insulationextendsforward to seal against the back of the fireplace masonry or non-combustible face.

SET THE REGENCY FP90 INTO POSITION

1)Estimate the total weight of the fireplace system and surround materials such as brick, stone, etc., to be installed. Shipping weight is 612 lbs (278kg).

2)Measure the square footage of the fl oor space to be occupied by the system, surrounds and hearth extensions.

3)Note the fl oor construction, i.e. 2 x 10’s, (51 x 250 mm), single or double joists, type and thickness of fl oor boards and consult your local building code to determine if you need additional support.

4)Remove door, fi rebox bricks, louvers etc.

Note: Set aside Gold louvers away from harsh chemicals and away from abrasive materials to avoid damage, e.g. muriatic acid for masonry wash will strip the gold plate. Firebricks are fragile and should be handled with caution.

The minimum ceiling height is 7ft (2m) from the base of the unit. A suitable non-combustible hearth pad is mandatory in all installations. See Framing Details.

INSTALLING THE CHIMNEY SYSTEM

Following are a set of general guidelines for installation of the chimney system. The more detailed installation manual supplied with the specifi c chimney system must be followed.

1)Using standard construction framing techniques, construct the opening for the chimney route up through the ceiling(s) and roof or through an outside chase. Framing must maintain adequate minimum air space clearance at all times.

CAUTION: Allow a minimum 2" (51mm) chimney air space or as specified by the owner's manual for the chimney, to combustible framing members throughout vertical or offset chimney installation.

2)Attach fi replace adaptor/anchor plate to the top of the fireplace. It is important that a tight seal be made with this part and the unit’s collar. This must be purchased with the fi replace.

3)Install fi restop, radiation shield, or attic insulation shield as required at each fl oor penetration. See Table 1 (page 15). Check chimney manufacturer's framing opening sizes to allow for correct clearances. All parts must be listed.

4)The roof fl ashing should be installed making sure that alignment is correct with openings below.

5)Chimney lengths may now be added until the required height is reached. A minimum fl ue height of 12ft. (4m) from the top of the unit is mandatory. Please refer to Table 2 for Flue Heights (page 15).

INSTALLATION

FPI FP90 Wood Fireplace

13

Image 13
Contents FP90 Wood Fireplace Regency Fireplace Product Table of Contents Safety Label for FP90 Safety LabelProduct Details InstallationPlease Retain this Manual for Future Reference Dimensions and Specifications Clearances and Height Requirements Fireplace Enclosure Framing Installation of Nailing StripsHearth Extension Framing DetailsBefore YOU Start Installation ComponentsChimney System Considerations Chase EnclosureOn E Installation Measurements / Framing DetailsInstalling STAND-OFFS Assembly StepsInstalling the Chimney System SET the Regency FP90 Into PositionSpecial Notes Offset Chimney InstallationElevation FT # of Elbows Above SEA Level Installing Outside AIR KITInstalling Blower Systems Wiring the FP90Gravity AIR Feed KIT Option Internal Blower with Thermo-DiscFinishing Regency FP90 Non-self Supporting, Thin Veneer Facades InstallationCompleting The Facing Masonry Retainer Kit Option Completing The Mantle Finishing DetailsMasonry Liner Bricks Glass Secondary AIR Tube InstallationSafety Precautions Ash Drawer Kit InstallationASH Drawer KIT OptionDiagram FAN InstallationMasonry Cover Plate Installation Installation 60W xAREA Finishing Trim KIT InstallationStandoff Installing the Handles on the Screen Fireplace Screen InstallationInstalling the Top Louver Installing the Bottom Louver Regency Louver InstallationInstalling the Facing Guide Excalibur Faceplate InstallationExcalibur Accent KIT Installation General Heatwave KIT not EPA ApprovedListings and Code Approvals InformationMinimum Framing Clearances InstallationR90 / EX90 Models All ModelsWiring Diagram MaintenanceOperation Operating Instructions Safety GuidelinesOperating Instructions First FirePlated Finishes Glass Cleaning MaintenanceGlass Removal Replacement Door GasketParts LIST- Firebox & Body Parts ListParts LIST- BAFFLES, DOOR, Options FPI FP90 Wood Fireplace Warranty Lifetime WarrantyInstaller Please complete the following information