Hearth and Home Technologies EDV3633L, EDV3633I Getting Started, Typical Appliance System

Page 17

4

Getting Started

Installer Guide

 

 

A. Typical Appliance System

NOTICE: Illustrations and photos reflect typical installations and are for design purposes only. Illustrations/diagrams are not drawn to scale. Actual product may vary from pictures in manual

Noncombustible roof flashing maintains minimum clearance around pipe (SECTION 10)

Vent Pipe (SECTIONS 7, 8, 10)

Ceiling Firestop on floor of attic (SECTION 8)

Vertical Termination Cap

(SECTION 10)

Storm Collar (SECTION 10)

Vent pipe penetrates roof, preferably without affecting roof rafters

(SECTION 8)

Attic insulation shield (not shown) must be used here to keep insulation away from vent pipe if attic is insulated. (SECTION 8)

Framing/Header

Framing Headed off

(SECTION 5)

in Ceiling Joists

 

(SECTION 8)

Optional

Wall Switch

Mantel & Mantel Leg

(SECTION 13)

Surround

Hearth Extension (not required)

Gas Line (SECTION 11)

Figure 4.1 Typical System

Heatilator • Eclipse • 4049-229 Rev F • 11/08

17

Image 17
Contents Do not Discard this Manual What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsInstaller Guide Troubleshooting CONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceLighting Instructions For Your Safety Read Before Lighting After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceVenting Maintenance Tasks-Qualified Service TechnicianEither cobrahead or SIT Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Mantel Legs or Wall Projections Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Installed Vertically HorizontallyThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Installing Ceiling Firestop Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldSecuring and Leveling the Appliance Appliance PreparationAssemble Slip Sections Installing SLP Vent PipeAssemble Vent Sections Disassemble Vent Sections Securing the Vent SectionsInstalling Metal Roof Flashing SLP-FS Install RF4-8Assemble and Install Storm Collar Installing Vertical Termination CapInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Fuel Conversion Gas InformationGas Pressure Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsGAS Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingRemove Glass Assembly Appliance SetupRemove Packaging Materials LogsGrilles and Screen Install Floor CoverReplace Glass Accessories Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramLength Vent Components DiagramsSLP-HRC-SS EDV3633 Service PartsEDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information