Hearth and Home Technologies EDV3633IL Termination Locations, Vent Termination Minimum Clearances

Page 22

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specified.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fire.

 

 

Horizontal

 

 

overhang

24 in. min.

20 in.

 

(508 mm)

 

(610 mm)

Vertical

Lowest

 

wall

 

Discharge

 

Termination

Opening

 

 

 

Cap

 

 

Storm Collar

 

X

 

12

 

 

Roof

 

 

Flashing

 

Roof Pitch

 

 

is X / 12

H (min.) - Minimum height from roof to lowest discharge opening.

Roof Pitch

H (Min.) Ft.

Roof Pitch

H (Min.) Ft.

Flat to 6/12

 

1.0*

Over 11/12 to 12/12

4.0

Over 6/12 to 7/12

1.25*

Over 12/12 to 14/12

5.0

Over 7/12 to 8/12

1.5*

Over 14/12 to 16/12

6.0

Over 8/12 to 9/12

2.0*

Over 16/12 to 18/12

7.0

Over 9/12 to 10/12

2.5

Over 18/12 to 20/12

7.5

Over 10/12 to 11/12

3.25

Over 20/12 to 21/12

8.0

 

* 3 ft. minimum in snow regions

 

 

Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

(See Figure 6.5 for specific clearances)

Figure 6.2 Clearance To Horizontal Termination Cap

A

B

 

6 in. (minimum) up to 20 in.

18 in. minimum

 

152 mm/508 mm

457 mm

 

20 in. and over

0 in. minimum

 

Gas, Wood or Fuel Oil

 

Termination Cap

 

 

 

Wall

B

(2.44 m)

Perpendicular

Minimum

 

 

DV = 20 in.

 

A *

(508 mm)

 

BV = 8 ft

 

Gas

 

 

Termination

 

 

Cap **

 

 

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood terminations, the wood termination cap must be higher than the gas termination cap.

Figure 6.3 Multiple Termination Caps

22

Heatilator • Eclipse • 4049-229 Rev F • 11/08

Image 22
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceAssemble Vent Sections Installing SLP Vent PipeAssemble Slip Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialRemove Packaging Materials Appliance SetupRemove Glass Assembly LogsReplace Glass Install Floor CoverGrilles and Screen Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information