Hearth and Home Technologies EDV3633IL, EDV3633L owner manual Installed Vertically Horizontally

Page 26

1. Top Vent - Horizontal Termination - (continued)

Two 45° Elbows replacing One 90° Elbow

4 ft min.

(1.22 m)

25 ft max. (7.62 m)

Figure 7.4

Two Elbows

Note: For corner installations: A 6 in. (152 mm) section of straight pipe may need to be attached to the appliance before a 90º elbow, to allow the vent pipe to clear the top standoffs.

V1 min.

V1 max.

H1+H2 max.

H1+H2+H3 max.

ft

m

ft

m

ft

m

ft

m

0.5

0.15

-

-

6

1.83

-

-

 

 

 

 

 

 

 

 

1

0.30

-

-

11

3.35

11

3.35

1.5

0.46

-

-

18

5.49

18

5.49

 

 

 

 

 

 

 

 

2

0.61

-

-

25

7.62

25

7.62

-

-

25

7.62

25

7.62

25

7.62

H2

Installed

Vertically

H3

Installed

Horizontally

H1V1

H2

Figure 7.5

26

Heatilator • Eclipse • 4049-229 Rev F • 11/08

Image 26
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceAssemble Slip Sections Installing SLP Vent PipeAssemble Vent Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialRemove Packaging Materials Appliance SetupRemove Glass Assembly LogsGrilles and Screen Install Floor CoverReplace Glass Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information