8 Vent Clearances and Framing

A. Pipe Clearances to Combustibles

WARNING! Risk of Fire! Maintain air space clearance to vent. DO NOT pack insulation or other combustibles:

Between ceiling firestops

Between wall shield firestops

Around vent system

Failure to keep insulation or other material away from vent pipe may cause over heating and fire.

Note: Heat shields MUST overlap by a minimum of 1 1/2 in. (38 mm).

SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to 194 mm thick).

If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed. If wall thickness is greater than 7-5/8 in. an extended heat shield will be required.

B. Wall Penetration Framing

Combustible Wall Penetration

Whenever a combustible wall is penetrated, you must frame a hole for the wall shield firestops. A wall shield firestop maintains minimum clearances and prevents cold air infiltration.

The opening must be framed on all four sides using the same size framing materials as those used in the wall construction.

A wall shield firestop must be placed on each side of an interior wall. A minimum 1 1/2 in. (38 mm) overlap of attached heat shields must be maintained.

See Section 10.L. for information for regarding the installation of a horizontal termination cap.

Non-Combustible Wall Penetration

3 in.

(76 mm)

Drywall

1 in. (25 mm)

2 x 4 or

Air space clearance to bottom and sides of horizontal pipe must be at least 1 in. (25 mm)

No combustible framing to be

If the hole being penetrated is surrounded by noncombus- tible materials such as concrete, a hole with diameter one inch greater than the pipe is acceptable.

Whenever a non-combustible wall is penetrated, the wall shield firestop is only required on one side and no heat shield is necessary.

2 x 6 header

WALL

located within shaded area.

3/4 in. (19 mm) minimum to perpendicular wall.

10 in. [254mm]

10in.

[254mm]

Vent

framing

hole

*When using SLP pipe, minimum clearances from the vent pipe to combustible materials at inside wall firestops are:

Top: 2-1/2 in. (64 mm)

Bottom: 1/2 in. (13 mm)

Sides: 1 in. (25 mm)

Figure 8.1 Horizontal Venting Clearances To Combustible Materi- als

The center of the framing hole is

1 in. [25mm] above the center of the horizontal vent pipe.

Framing should be constructed of 2 X 4 lumber or heavier.

36 1/2 in. [927 mm]

(Center of pipe)

Figure 8.2 Wall Penetration

30

Heatilator • Eclipse • 4049-229 Rev F • 11/08

Image 30
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationTable of Contents Installer GuideUser Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating InstructionsYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceInstalling SLP Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialRemove Packaging Materials Appliance SetupRemove Glass Assembly LogsInstall Floor Cover Replace GlassGrilles and Screen Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information