Hearth and Home Technologies EDV3633L, EDV3633IL owner manual Finishing, Facing Material

Page 45

13 Finishing

A. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances to combustibles as specified. Framing or finishing material closer than the minimums listed must be construct- ed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Mantels

Note: All

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

measurements

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30 in.

 

minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

in inches.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to ceiling

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

19-

1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

18-

 

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

12

 

 

17-

3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

16-

1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15-

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

14-

3/4

 

 

 

 

 

 

 

 

 

 

 

5

6

7

13-

 

1/4

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12-

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

11-

3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

10-

 

1/4

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8-

3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured from top of fireplace opening (in inches)

Figure 13.1 Minimum Vertical and Maximum Horizontal Dimensions

Combustible Mantel Legs/Wall Projections

B. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

Seal joints between the finished wall and appliance top and sides using a 300 °F minimum sealant. Refer to Figure 13.3.

WARNING! Risk of Fire! DO NOT apply combustible ma- terials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will inter- fere with proper operation of doors and louvers.

Finish wall material may be combustible - Top and Sides

0 in.

0 in.

0 in.

High Temperature Sealant (300° F/149° C min.)

Top and Side Seal Joint

Top of

Appliance

A2 in. (51 mm) min. from fireplace opening to perpendicular wall

Drywall

A

Mantel Leg or Perpendicular Wall

Figure 13.3 Noncombustible Facing Diagram

Figure 13.2 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

Heatilator • Eclipse • 4049-229 Rev F • 11/08

45

Image 45
Contents Do not Discard this Manual What to do if you smell gasHomeowner Reference Information CongratulationsTable of Contents Installer GuideUser Guide Troubleshooting CONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating InstructionsYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit Clear SpaceLighting Instructions For Your Safety Read Before Lighting After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceVenting Maintenance Tasks-Qualified Service TechnicianEither cobrahead or SIT Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Mantel Legs or Wall Projections Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Approved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsOne Elbow Vent DiagramsTop Vent Horizontal Termination Installed Vertically HorizontallyThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Installing Ceiling Firestop Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldSecuring and Leveling the Appliance Appliance PreparationInstalling SLP Vent Pipe Assemble Vent SectionsAssemble Slip Sections Disassemble Vent Sections Securing the Vent SectionsInstalling Metal Roof Flashing SLP-FS Install RF4-8Assemble and Install Storm Collar Installing Vertical Termination CapInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Fuel Conversion Gas InformationGas Pressure Gas ConnectionStanding Pilot Ignition System Wiring Wiring RequirementsIntellifire Ignition System Wiring Optional Accessories RequirementsGAS Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingRemove Glass Assembly Appliance SetupRemove Packaging Materials LogsInstall Floor Cover Replace GlassGrilles and Screen Accessories Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramLength Vent Components DiagramsSLP-HRC-SS EDV3633 Service PartsEDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information