Hearth and Home Technologies EDV3633L, EDV3633IL owner manual Service Parts

Page 56

56

Heatilator • Eclipse • 4049-229 Rev F • 11/08

 

Service Parts

EDV3633

 

Service Parts Diagram

Beginning Manufacturing Date: April 2008

Ecilpse DV

Ending Manufacturing Date: Active

 

 

4

6

5 7

8

9

10

16

15

11

12

13

14

Log Set Assembly

2 3

1

08/08

 

Service Parts

 

 

EDV3633

 

 

Service Parts List

Beginning Manufacturing Date: April 2008

 

 

Eclipse DV

 

Ending Manufacturing Date: Active

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

 

 

 

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

 

in this manual may be ordered from an authorized dealer.

 

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

 

Log Assembly

 

4049-015

 

Y

1

Front Log Assembly

 

4049-031

 

N

2

Side Log Assembly

 

4049-032

 

N

3

Back Log Assembly

 

4049-033

 

N

4

Top Face

 

4049-217

 

N

5

Glass Clip Support Assembly

Qty 4 req.

33858

 

Y

6

Burner Pan Assembly NG

 

4049-034

 

Y

Burner Pan Assembly LP

 

4049-035

 

Y

 

 

 

7

Burner Pan Top

 

4049-170

 

N

8

Burner Pan Gasket

 

4049-053

 

N

9

Burner Pan Bottom

 

4049-123

 

N

10

Glass/Frame Assembly

 

4049-039

 

Y

11

Top Face

 

4049-217

 

N

12

Screen

 

4049-193

 

Y

13

Bottom Face

 

4049-218

 

N

14

Floor Cover

 

4049-226

 

N

15

Air Shutter

 

4049-160

 

Y

16

Air Shutter Bracket

 

4049-161

 

N

 

 

 

 

 

 

 

Junction Box

 

4021-013

 

Y

 

Junction Box Cover Plate

 

4031-222

 

N

 

90 degree Elbow

 

SL-90D

 

N

 

Trapezoid Term Cap 6 5/8

Pre GA1760888

SLK-01TRD

 

N

 

Long Horizontal Term Cap Kit

Post GA 1760888

SLP-TRAP2

 

N

 

Ecilpse Installation Instructions

 

4049-229

 

N

 

Lava Rock Bag Assembly

 

4042-341

 

N

 

Mineral Wool

 

14333B

 

N

 

Lava Rock

 

4021-295

 

N

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Conversion Kit NG

 

N/A

 

Y

 

Conversion Kit LP

 

SCKP-EHS

 

Y

 

Pilot Orifice NG

 

29476

 

Y

 

Pilot Orifice LP

 

29477

 

Y

 

Regulator NG

 

NGK-11

 

Y

 

Regulator LP

 

LPK-11

 

Y

Additional

service part numbers on following page.

 

 

 

 

 

 

 

 

 

08/08

C. Service Parts

Image 56
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceAssemble Slip Sections Installing SLP Vent PipeAssemble Vent Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Standing Pilot Ignition System WiringIntellifire Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Remove Glass AssemblyRemove Packaging Materials LogsGrilles and Screen Install Floor CoverReplace Glass Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information