Hearth and Home Technologies EDV3633L, EDV3633IL owner manual Top Vent Vertical Termination

Page 28

2. Top Vent - Vertical Termination

No Elbow

12 ft (3.66 m) min.

60 ft (18.29 m) min.

Note: If installing a vertical vent/ termination off the top of the ap- pliance, the flue restrictor should be used.

Figure 7.7

Two Elbows

Maximum horizontal

run is 100% of

vertical, but cannot exceed 26 ft (7.92 m)

12 ft (3.66 m) min.

60 ft (18.29 m) max.

Figure 7.8

28

Heatilator • Eclipse • 4049-229 Rev F • 11/08

Image 28
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceAssemble Vent Sections Installing SLP Vent PipeAssemble Slip Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Standing Pilot Ignition System WiringIntellifire Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Remove Glass AssemblyRemove Packaging Materials LogsReplace Glass Install Floor CoverGrilles and Screen Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information