Hearth and Home Technologies EDV3633IL, EDV3633L owner manual Standing Pilot Valve Assembly

Page 58

58

Heatilator • Eclipse • 4049-229 Rev F • 11/08

 

Service Parts

 

 

EDV3633

 

Valve Assembly Parts Diagram

Beginning Manufacturing Date: April 2008

 

Eclipse DV

 

Ending Manufacturing Date: Active

Standing Pilot Valve Assembly

 

 

 

 

3

 

 

 

 

1

 

 

 

 

2

 

 

 

 

 

 

10

 

 

 

 

9

 

 

4

 

 

 

 

 

6

 

 

 

 

 

8

 

 

5

 

 

 

 

 

 

7

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

 

Valve Assembly NG

 

4049-048

N

 

Valve Assembly LP

 

4049-049

N

1

Pilot Assembly NG

 

2103-010

Y

Pilot Assembly LP

 

2103-011

Y

 

 

2

Valve NG

 

30494

Y

Valve LP

 

30495

Y

 

 

3

Flex Ball Valve Assembly

 

302-320A

Y

4

Piezo Ignitor

 

291-513

Y

5

Valve Bracket

 

4049-169

N

6

Male connector Brass-Flex

 

17069

N

7

Bulkhead Gasket

 

4021-429

N

8

Bulkhead

 

4021-428

Y

9

Orifice NG, Threaded (.083)

 

4021-435

Y

Orifice LP, Threaded (.053)

 

4021-426

Y

 

 

10

Pilot Gasket

 

4041-042

N

 

Wall Switch Wire Assembly M/M

 

28602

Y

 

 

 

 

08/08

 

 

Service Parts

 

 

EDV3633I, EDV3633IL

 

 

Valve Assembly Parts Diagram

Beginning Manufacturing Date: April 2008

 

 

Eclipse DV

 

 

 

 

Ending Manufacturing Date: Active

 

 

 

 

 

 

 

 

IPI Valve Assembly

 

1

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

7

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

5

4

3

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

10

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

 

 

at Depot

ITEM

DESCRIPTION

 

 

 

COMMENTS

PART NUMBER

 

 

Valve Assembly NG

 

 

 

 

 

4049-050

N

 

Valve Assembly LP

 

 

 

 

 

4049-051

N

1

Pilot Assembly NG

 

 

 

 

 

2090-012

Y

Pilot Assembly LP

 

 

 

 

 

2090-013

Y

 

 

 

 

 

 

2

Pilot Gasket

 

 

 

 

 

4021-042

N

3

Orifice NG, Threaded (.083)

 

 

 

 

 

4021-435

Y

Orifice LP, Threaded (.053)

 

 

 

 

 

4021-426

Y

 

 

 

 

 

 

4

Bulkhead

 

 

 

 

 

4021-428

Y

5

Male connector Brass-Flex

 

 

 

 

 

17069

N

6

Valve NG

 

 

 

 

 

593-500

Y

 

Valve LP

 

 

 

 

 

593-501

Y

7

Flex Ball Valve Assembly

 

 

 

 

 

302-320A

Y

8

Valve Bracket

 

 

 

 

 

4049-169

N

9

Bulkhead Gasket

 

 

 

 

 

4021-429

N

10

3V Adapter Plug

 

 

 

 

 

593-593A

Y

11

Control Module

 

 

 

 

 

593-592

Y

12

Wire Assembly

 

 

 

 

 

593-590A

Y

 

Wall Switch Wire Assembly M/M

 

 

 

 

4018-018

Y

 

Battery Pack

 

 

 

 

 

593-594A

Y

 

 

 

 

 

 

 

 

08/08

C. Service Parts (continued)

Image 58
Contents What to do if you smell gas Do not Discard this ManualCongratulations Homeowner Reference InformationInstaller Guide Table of ContentsUser Guide Troubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions Gas Fireplace SafetyYour Fireplace Fan Kit Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceLighting Instructions For Your Safety Read Before Lighting Frequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician VentingEither cobrahead or SIT Getting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections Mantels Mantel Legs or Wall ProjectionsTermination Locations Vent Termination Minimum ClearancesMinimum Clearances for Termination Vent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsVent Diagrams One ElbowInstalled Vertically Horizontally Top Vent Horizontal TerminationThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Install the Ceiling Firestop Installing Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationAppliance Preparation Securing and Leveling the ApplianceAssemble Vent Sections Installing SLP Vent PipeAssemble Slip Sections Securing the Vent Sections Disassemble Vent SectionsInstalling Metal Roof Flashing Install RF4-8 SLP-FSInstalling Vertical Termination Cap Assemble and Install Storm CollarInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Pressure Gas InformationFuel Conversion Gas ConnectionIntellifire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Optional Accessories RequirementsElectrical Service and Repair GASJunction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialRemove Packaging Materials Appliance SetupRemove Glass Assembly LogsReplace Glass Install Floor CoverGrilles and Screen Air Shutter Setting AccessoriesTroubleshooting Standing Pilot Ignition SystemTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Will not ignite. If the pilot Appliance Dimension Diagram Reference MaterialsVent Components Diagrams LengthSLP-HRC-SS Service Parts EDV3633EDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information