Hearth and Home Technologies EDV3633 Securing the Vent Sections, Disassemble Vent Sections

Page 35

C. Securing the Vent Sections

Vertical runs of SLP pipe must be supported every 8 ft. (2.44 m).

Horizontal sections of vent must be supported every 5 ft. (1.52 m) with a vent support or plumber’s strap.

Wall shield firestops may be used to provide horizontal support.

Vent support or plumber’s strap (spaced 120° apart) may be used for support. See Figures 10.4 and 10.5.

SLP ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxi- ation! Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per installation instructions. DO NOT allow vent to sag below connection point to appliance.

D. Disassemble Vent Sections

Rotate either section (see Figure 10.6) so the seams on both pipe sections are aligned as shown in Figure 10.7.

Pull carefully to separate the pieces of pipe.

Figure 10.4 Securing Vertical Pipe Sections

Figure 10.5 Securing Horizontal Pipe Sections

Figure 10.6 Rotate Seams for Disassembly

Figure 10.7 Align and Disassemble Vent Sections

Heatilator • Eclipse • 4049-229 Rev F • 11/08

35

Image 35
Contents Do not Discard this Manual What to do if you smell gasHomeowner Reference Information CongratulationsUser Guide Table of ContentsInstaller Guide Troubleshooting CONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan KitLighting Instructions For Your Safety Read Before Lighting After Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceVenting Maintenance Tasks-Qualified Service TechnicianEither cobrahead or SIT Typical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMantels Mantel Legs or Wall Projections Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Use of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyOne Elbow Vent DiagramsTop Vent Horizontal Termination Installed Vertically HorizontallyThree Elbows Top Vent Vertical Termination 12 ft 3.66 m min 60 ft 18.29 m max Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Installing Ceiling Firestop Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldSecuring and Leveling the Appliance Appliance PreparationAssemble Slip Sections Installing SLP Vent PipeAssemble Vent Sections Disassemble Vent Sections Securing the Vent SectionsInstalling Metal Roof Flashing SLP-FS Install RF4-8Assemble and Install Storm Collar Installing Vertical Termination CapInstall Heat Shields and Horizontal Termi- nation Cap Install Horizontal Termination Cap Gas Connection Gas InformationFuel Conversion Gas PressureOptional Accessories Requirements Wiring RequirementsStanding Pilot Ignition System Wiring Intellifire Ignition System WiringGAS Electrical Service and RepairWall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingLogs Appliance SetupRemove Glass Assembly Remove Packaging MaterialsGrilles and Screen Install Floor CoverReplace Glass Accessories Air Shutter SettingStanding Pilot Ignition System TroubleshootingSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Will not ignite. If the pilot Reference Materials Appliance Dimension DiagramLength Vent Components DiagramsSLP-HRC-SS EDV3633 Service PartsEDV3633I, EDV3633IL Standing Pilot Valve Assembly Optional Components Contact Information