Baxi Potterton G.C.No 47 393 23 System Details, Information, Central Heating Circuit, Bypass

Page 12

6.0System Details

6.1Information

1.The Promax Combi Condensing Combination Boiler is a ‘Water Byelaws Scheme - Approved Product’.

To comply with the Water Byelaws your attention is drawn to the following installation requirements and notes (IRN).

a) IRN 001 - See text of entry for installation

 

requirements and notes.

b) IRN 302 -

Byelaw 14.

2.Reference to the WRc publications, ‘Water fittings and materials directory’ and ‘Water supply byelaws guide’ give full details of byelaws and the IRNs.

6.2Central Heating Circuit

1.The appliance is suitable for fully pumped SEALED SYSTEMS ONLY.

Treatment of Water Circulating Systems

All recirculatory water systems will be subject to corrosion unless an appropriate water treatment is applied. This means that the efficiency of the system will deteriorate as corrosion sludge accumulates within the system, risking damage to pump and valves, boiler noise and circulation problems.

When fitting new systems flux will be evident within the system, which can lead to damage of system components.

All systems must be thoroughly drained and flushed out using, for example, Sentinel X300 or X400 or Fernox F3. They should be used following the flushing agent manufacturer’s instructions.

System additives - corrosion inhibitors and flushing agents/descalers should comply to BS7593 requirements, e.g. Sentinel X100 and Fernox MB-1 which should be used following the inhibitor manufacturer’s instructions.

Full instructions are supplied with the products, for further information contact Sentinel (0800 389 4670) or Fernox (0870 870 0362)

Failure to flush and add inhibitor to the system will invalidate the appliance warranty.

It is important to check the inhibitor concentration after installation, system modification and at every service in accordance with the manufacturer’s instructions. (Test kits are available from inhibitor stockists.)

For information or advice regarding any of the above contact Technical Enquiries.

6.3Bypass

1.The boiler utilises the primary side of the DHW plate heat exchanger as an automatic integral bypass.

6.4System Control

1.The boiler is designed for use in a heating system that incorporates external controls, i.e. a minimum of a timer device.

2.Suitable timer kits are available as optional extras.

3.For optimum operating conditions and maximum economy the fitting of a programmable room thermostat is recommended.

12© Baxi Heating UK Ltd 2011

Image 12
Contents Installation & Service Instructions 0086 Installer Notification Guidelines Scheme Members onlyImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice refer to the most recent version Safe Manual Handling GeneralPreparation TechniqueContents Contents of Pack IntroductionDescription General Layout LayoutFrost Protection Mode Appliance OperationPump Protection Technical Data Promax Combi 24, 28Dimensions and Fixings OrientationTap Rail 32.5 mm Condensate Drain 65 mmSystem Details InformationCentral Heating Circuit BypassSystem Filling and Pressurising Fig Expansion Vessel Central Heating onlyPressure Relief Valve Fig Domestic Hot Water Circuit Fig ShowersHard Water Areas Site Requirements LocationAt Least 1.5 7.2 Clearances Figs Site Requirement Ventilation of CompartmentsGas Supply Electrical SupplyCondensate Drain Flue Flue terminal guardEach fitting to aid assembly Flue OptionsHorizontal Flue Systems Horizontal FluesVertical Flues Twin & Vertical Flue Systems120mm Min ApartFlue Accessories Key Accessory Size Code NoTelescopic Internal Flue Kit Twin Flue Duct Adaptor Twin Flue ConnectionAir Duct Connection Flue Duct Connection Boiler Adaptor Flue Dimensions For Roof TerminalsFlue Trim Terminal Guard FigPlume Displacement Plume Displacement Kit FigMetres Ring Adaptor 28/33 Determining Permissible LengthsExample 5121368General Fitting Notes 30mmElbow to allow the flue to be installed as shown 60Ø extension piece. It must be secured using twoUsing a suitable bit e.g mm, drill through Extension and outlet. Secure using two of the screwsInstallation Unpacking & Initial PreparationFlushing After considering the site requirementsFitting The Boiler Fitting the Pressure Relief Discharge Pipe FigCondensate Drain see section Tighten all the connectionsFitting The Flue Wall Thickness WasteFlue Elbow Ensure Elbow is fully Engaged into BoilerInner Flue Support Bracket 25mm Extension Cut EndEnsure Extension is fully engaged into Boiler Adaptor Making The Electrical Connections Preliminary Electrical ChecksTerminal Block Cover Cable Clamp Commissioning Commissioning the BoilerPressure Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingAnnual Servicing Inspection Case Front Panel Facia Panel Securing Screws10 ±1 Burner Sensing ElectrodeViewing Window Changing Components Igniter FigSpark and Sensing Electrodes Fig Fan Fig Venturi FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Fig Insulation FigBurner Gasket Extension Piece Central Heating Temperature Sensor NTC Fig Safety Thermostat FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigPump Head Only Fig Pump Complete FigAutomatic Air Vent Fig Pressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Fig Plate Heat Exchanger FigSelector Switch Fig 14.22 P.C.B. FigThrottle Adjustment Screw Gas Valve FigExpansion Vessel Fig Setting the Gas Valve Setting the Gas Valve CO2 checkFlue Adaptor Test Point Plug Analyser Probe ThrottleIllustrated Wiring Diagram ElectricalShort Parts List Short Parts List306 302Fault Finding Initial Fault Finding ChecksError Codes Error 133 flashing Go to section ‘A’ Turn the selector switch toReset position for 5 seconds Pump runsTurn selector switch to Error 133 flashing Go to section ‘I’Turn Domestic Hot Water Open DHW tap fullyPCB X3 connector terminals 3 Switch terminalFan jammed or faulty winding Replace PCB Replace waterCheck wiring Viewing Window Replace sensor or PCB E28Gas at burner Replace gas valveReplace safety thermostat Replace PCB Is there 230V atReplace sensor Page Page Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL

G.C.No 47 393 22, G.C.No 47 393 23, G.C.No 47 393 21 specifications

The Baxi Potterton range, specifically the models identified by G.C. No 47 393 21, G.C. No 47 393 23, and G.C. No 47 393 22, represents a robust selection of domestic heating solutions that cater to diverse consumer needs. Known for their reliability and efficiency, these boilers are designed with advanced technologies that ensure consistent performance and high levels of user satisfaction.

One of the primary features of these models is their compact design, allowing for flexibility in installation within various home environments. Whether placed in a kitchen, utility room, or cupboard, the space-saving configurations make them ideal for homeowners with limited installation areas.

These boilers utilize a high-efficiency heat exchanger that maximizes heating output while minimizing fuel consumption. This not only results in lower energy bills for consumers but also contributes positively towards reducing carbon footprints. The G.C. No 47 393 21, 47 393 22, and 47 393 23 models are known for their impressive Seasonal Efficiency Ratings, indicating superior energy efficiency, which is vital for compliance with modern building regulations.

In terms of technology, these models feature user-friendly digital displays that provide real-time information on system performance, making it easier for users to monitor and manage their home's heating needs. Additionally, some models come equipped with advanced control systems that allow homeowners to adjust settings remotely via smartphone applications, further enhancing convenience.

Safety is paramount in the design of Baxi Potterton boilers. Each unit is equipped with multiple safety features including built-in frost protection, pressure relief valves, and gas leak detection systems. This commitment to safety ensures peace of mind for users, knowing that their heating system is designed to operate securely.

Another significant characteristic of these models is their compatibility with renewable energy sources. They can work in conjunction with solar thermal systems and can be integrated into larger renewable setups, promoting sustainability in home heating.

In summary, the Baxi Potterton G.C. No 47 393 21, G.C. No 47 393 23, and G.C. No 47 393 22 models are a testament to modern engineering and design. With their emphasis on efficiency, safety, and convenience, they provide exceptional heating solutions for today's energy-conscious homeowners.