Baxi Potterton G.C.No 47 393 23, G.C.No 47 393 21 Flue Accessories, Key Accessory Size Code No

Page 21

A4

A2

A3

B

E

 

CD

GF

U,W

N

S

© Baxi Heating UK Ltd 2011

 

 

 

8.0

Flue Options

 

 

 

 

 

8.3

Flue Accessories

 

 

 

 

 

Key

Accessory

Size

Code No

 

 

 

FLUE GROUP A

 

 

 

 

 

Concentric Flue System 100mm diameter

 

A

 

 

A

Horizontal Flue Terminal (inc. elbow)

5118489

 

 

A2

Telescopic Flue (inc. elbow)

315-500mm 5118069

 

 

 

 

 

 

A3

Telescopic Internal Flue Kit

315-500mm 5119654

 

 

 

B

Flue Extension

1000mm

5111074

 

 

 

C

Flue Bend

93°

5111075

 

 

 

D

Flue Bend (pair)

135°

5111085

 

 

 

U

Pipe Support (painted)

100mm Ø

5111080

 

 

 

R

Vertical Flue Adaptor

 

5111070

 

 

 

P

Wall Liner

 

5111067

 

 

 

S

Flue Terminal Deflector

 

5111068

 

 

 

FLUE GROUP N

 

 

 

 

 

Twin Flue System 80mm diameter

 

 

P

 

 

E

Flue Extension (pair)

1000mm

5111087

 

 

 

F

Flue Bend (pair)

90°

5111072

 

K,K1

 

G

Flue Bend (2 pair)

135°

5111086

 

 

J

Vertical Flue Boiler Adaptor Kit

 

720089801

 

 

 

 

 

 

 

H

Vertical Flue Adaptor

 

5111084

 

 

 

W

Pipe Support (pair)

80mm

5111081

 

 

 

Y

Flue Termination Kit

 

 

 

 

 

 

(horizontal termination)

80mm

5120172

 

 

 

Z

Single Terminal

80mm

5121791

 

 

 

Q

Adaptor

60/80

5121792

R

 

 

T

Pitched Roof Terminal

25°/45°

5106164

 

 

 

 

 

 

 

 

 

FLUE GROUP G

 

 

 

 

 

Concentric Flue System 80/125mm diameter

 

 

 

 

A4

Horizontal Flue Kit

 

5118580

 

 

 

B

Straight Extension Kit

1000mm

5118584

 

 

 

D

Bend Kit (pair)

135°

5118597

 

 

 

C

Bend

91.5°

5118588

 

 

 

U

Pipe support

125mm

5118610

 

 

M

FLUE GROUP A, N, G

 

 

 

 

Vertical Flue Kits

 

 

H

 

 

 

 

 

 

K

Vertical Flue Terminal (use with 5111070)

5111078

 

 

 

 

 

 

K1

Vertical Flue Terminal

 

5118576

 

 

 

L

Pitched Roof Flashing

25°/50°

5122151

 

 

 

M

Roof cover plate

 

246143

 

 

 

N

Flat roof flashing

 

246144

Y,Z

L

T

Q

J

21

Image 21
Contents Installation & Service Instructions 0086 Scheme Members only Installer Notification GuidelinesImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice refer to the most recent version General Safe Manual HandlingPreparation TechniqueContents Contents of Pack IntroductionDescription Layout General LayoutFrost Protection Mode Appliance OperationPump Protection Promax Combi 24, 28 Technical DataOrientation Dimensions and FixingsTap Rail 32.5 mm Condensate Drain 65 mmInformation System DetailsCentral Heating Circuit BypassSystem Filling and Pressurising Fig Expansion Vessel Central Heating onlyPressure Relief Valve Fig Domestic Hot Water Circuit Fig ShowersHard Water Areas Site Requirements LocationAt Least 1.5 7.2 Clearances Figs Ventilation of Compartments Site RequirementGas Supply Electrical SupplyCondensate Drain Flue terminal guard FlueFlue Options Each fitting to aid assemblyHorizontal Flue Systems Horizontal FluesTwin & Vertical Flue Systems Vertical Flues120mm Min ApartFlue Accessories Key Accessory Size Code NoTelescopic Internal Flue Kit Twin Flue Duct Adaptor Twin Flue ConnectionAir Duct Connection Flue Duct Connection Boiler Adaptor For Roof Terminals Flue DimensionsFlue Trim Terminal Guard FigPlume Displacement Plume Displacement Kit FigMetres Ring Adaptor Determining Permissible Lengths 28/33Example 512136830mm General Fitting Notes60Ø extension piece. It must be secured using two Elbow to allow the flue to be installed as shownUsing a suitable bit e.g mm, drill through Extension and outlet. Secure using two of the screwsUnpacking & Initial Preparation InstallationFlushing After considering the site requirementsFitting the Pressure Relief Discharge Pipe Fig Fitting The BoilerCondensate Drain see section Tighten all the connectionsWall Thickness Waste Fitting The FlueFlue Elbow Ensure Elbow is fully Engaged into BoilerInner Flue Support Bracket 25mm Extension Cut EndEnsure Extension is fully engaged into Boiler Adaptor Making The Electrical Connections Preliminary Electrical ChecksTerminal Block Cover Cable Clamp Commissioning the Boiler CommissioningPressure Completion CompletionCase Front Panel Facia Panel 13 .1 Annual Servicing ServicingAnnual Servicing Inspection Case Front Panel Facia Panel Securing Screws10 ±1 Burner Sensing ElectrodeViewing Window Changing Components Igniter FigSpark and Sensing Electrodes Fig Venturi Fig Fan FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Fig Insulation FigBurner Gasket Extension Piece Safety Thermostat Fig Central Heating Temperature Sensor NTC FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigPump Head Only Fig Pump Complete FigAutomatic Air Vent Fig Hall Effect Sensor Fig Pressure Gauge FigsPlate Heat Exchanger Fig Diverter Valve Motor Unit & Assembly Fig14.22 P.C.B. Fig Selector Switch FigThrottle Adjustment Screw Gas Valve FigExpansion Vessel Fig Setting the Gas Valve CO2 check Setting the Gas ValveFlue Adaptor Test Point Plug Analyser Probe ThrottleElectrical Illustrated Wiring DiagramShort Parts List Short Parts List306 302Fault Finding Initial Fault Finding ChecksError Codes Go to section ‘A’ Turn the selector switch to Error 133 flashingReset position for 5 seconds Pump runsError 133 flashing Go to section ‘I’ Turn selector switch toTurn Domestic Hot Water Open DHW tap fullySwitch terminal PCB X3 connector terminals 3Fan jammed or faulty winding Replace PCB Replace waterReplace sensor or PCB E28 Check wiring Viewing WindowGas at burner Replace gas valveReplace safety thermostat Replace PCB Is there 230V atReplace sensor Page Page Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL