Baxi Potterton G.C.No 47 393 22, G.C.No 47 393 23, G.C.No 47 393 21 manual Service Record

Page 59

Service Record

It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.

Service Provider

Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.

Always use the manufacturer’s specified spare part when replacing controls.

Service 1 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 3 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 5 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 7 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 9 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Service 2 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 4 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 6 Date:

Engineer Name:

Company Name:

Telephone No.

Operative ID No.

Comments:

Signature:

Service 8 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

Service 10 Date:

Engineer Name:

Company Name:

Telephone No.

Gas Safe Register No.

Comments:

Signature:

 

Signature:

59

Image 59
Contents Installation & Service Instructions 0086 Scheme Members only Installer Notification GuidelinesCodes of Practice refer to the most recent version Important Installation, Commissioning, Service & RepairLegislation Technique Safe Manual HandlingGeneral PreparationContents Description Contents of PackIntroduction Layout General LayoutPump Protection Frost Protection ModeAppliance Operation Promax Combi 24, 28 Technical Data32.5 mm Condensate Drain 65 mm Dimensions and FixingsOrientation Tap RailBypass System DetailsInformation Central Heating CircuitPressure Relief Valve Fig System Filling and Pressurising FigExpansion Vessel Central Heating only Hard Water Areas Domestic Hot Water Circuit FigShowers At Least 1.5 7.2 Clearances Figs Site RequirementsLocation Electrical Supply Site RequirementVentilation of Compartments Gas SupplyCondensate Drain Flue terminal guard FlueHorizontal Flues Each fitting to aid assemblyFlue Options Horizontal Flue SystemsApart Vertical FluesTwin & Vertical Flue Systems 120mm MinTelescopic Internal Flue Kit Flue AccessoriesKey Accessory Size Code No Air Duct Connection Flue Duct Connection Boiler Adaptor Twin Flue Duct AdaptorTwin Flue Connection Terminal Guard Fig Flue DimensionsFor Roof Terminals Flue TrimMetres Ring Adaptor Plume DisplacementPlume Displacement Kit Fig 5121368 28/33Determining Permissible Lengths Example30mm General Fitting NotesExtension and outlet. Secure using two of the screws Elbow to allow the flue to be installed as shown60Ø extension piece. It must be secured using two Using a suitable bit e.g mm, drill throughAfter considering the site requirements InstallationUnpacking & Initial Preparation FlushingTighten all the connections Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Condensate Drain see sectionEnsure Elbow is fully Engaged into Boiler Fitting The FlueWall Thickness Waste Flue ElbowEnsure Extension is fully engaged into Boiler Adaptor Inner Flue Support Bracket25mm Extension Cut End Terminal Block Cover Cable Clamp Making The Electrical ConnectionsPreliminary Electrical Checks Commissioning the Boiler CommissioningPressure Case Front Panel Facia Panel CompletionCompletion Case Front Panel Facia Panel Securing Screws Servicing13 .1 Annual Servicing Annual Servicing InspectionViewing Window 10 ±1Burner Sensing Electrode Spark and Sensing Electrodes Fig Changing ComponentsIgniter Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan Collector Fan FigVenturi Fig Injector FigBurner Gasket Extension Piece Burner FigInsulation Fig Flue/Heat Exchanger Thermostat Sensor Fig Central Heating Temperature Sensor NTC FigSafety Thermostat Fig DHW Temperature Sensor NTC FigAutomatic Air Vent Fig Pump Head Only FigPump Complete Fig Hall Effect Sensor Fig Pressure Gauge FigsPlate Heat Exchanger Fig Diverter Valve Motor Unit & Assembly Fig14.22 P.C.B. Fig Selector Switch FigExpansion Vessel Fig Throttle Adjustment ScrewGas Valve Fig Throttle Setting the Gas ValveSetting the Gas Valve CO2 check Flue Adaptor Test Point Plug Analyser ProbeElectrical Illustrated Wiring Diagram302 Short Parts ListShort Parts List 306Error Codes Fault FindingInitial Fault Finding Checks Pump runs Error 133 flashingGo to section ‘A’ Turn the selector switch to Reset position for 5 secondsOpen DHW tap fully Turn selector switch toError 133 flashing Go to section ‘I’ Turn Domestic Hot WaterReplace water PCB X3 connector terminals 3Switch terminal Fan jammed or faulty winding Replace PCBReplace gas valve Check wiring Viewing WindowReplace sensor or PCB E28 Gas at burnerReplace sensor Replace safety thermostatReplace PCB Is there 230V at Page Page Condensing Boilers only Service Record Brooks House, Coventry Road, Warwick. CV34 4LL