Hoshizaki FD-1001MLH(-C), FD-1001MRH(-C), FD-1001MAH(-C) Thumbscrew Infrared Sensor Housing Lens

Page 33

7)"GM" LED and "COMP" LED are on. Use an object to cover the infrared sensor lens at the bottom of the icemaker. If the bottom of the icemaker is not accessible in your application, remove the thumbscrew securing the infrared sensor housing, remove the housing from the base, then cover the infrared sensor lens. See Fig. 18. The yellow LED on the infrared sensor turns on. The yellow LED flashes when ice is at the outer limit of its range and turns steady as ice nears. After the yellow LED turns on (flashing or steady), the infrared sensor shutdown delay timer starts counting down based on

S1 dip switch 1, 2, and 3 setting. The compressor should de-energize immediately after the shutdown delay timer expires. 5 minutes later, the gear motor and fan motor should deenergize.

8)Remove the object covering the infrared sensor. If you removed the infrared sensor housing from the base, replace it in its correct position, and secure it with the thumbscrew.

9)Move the power switch to the "OFF" position. Turn off the power supply, then proceed to "II.K.2. Mechanical Backup Bin Control Check."

Thumbscrew

Infrared Sensor

Infrared Sensor

Housing

Lens

Infrared Sensor

Fig. 18

33

Image 33
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Serious injury Important Safety InformationIndicates important information about the use and care UnitFD-1001MAH-C air-cooled Specifications Nameplate RatingFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system Checks Before Installation II. Installation and Operating InstructionsHow to Remove Panels See FigLocation SetupElectrical Connection For All ModelsAdditional Warnings for Remote Air-Cooled Model Installation of Remote Condenser Unit Checks Before InstallationLocation Line Set SetupField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Connection to an R-404A Parallel Rack System Line Set InstallationRack System-Braze Connection Entire Male Fitting See , 15, or Water Supply and Drain ConnectionsIcemaker FD-1001MAH-C FD-1001MRH-C FD-1001MLH-CConnection FD-1001MWH-C CondenserTo a Potable Water SupplyFD-1001MWH-C Connection toClosed Loop Final Checklist Startup Infrared Sensor Check Bin Control CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Seconds 1.6 minutes Infrared Sensor Shutdown DelayCleaning and Sanitizing Instructions III. Cleaning and MaintenanceCleaning Solution Cleaning ProcedureFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Frequency Area Task MaintenancePreparing the Icemaker for Long Storage Remove the water from the icemaker water supply lineDrain the evaporator Page Hoshizaki AMERICA, INC