3. Infrared Sensor Shutdown Delay

This is the delay between the infrared sensor detecting ice and the start of the shutdown sequence. The infrared sensor shutdown delay is factory-adjusted to 100 seconds and no adjustment is required for most dispenser unit/storage bin applications.

a) Standard Storage Bin:

When installed on a standard storage bin, any shutdown delay setting is acceptable.

b) Dispenser Unit:

For typical dispenser unit applications, a 100-second shutdown delay is recommended. However, on some dispenser unit applications, the ice level at shutoff may need to be adjusted depending on the dispenser agitation or dispense method. Should a different shutdown delay be desired, adjust S1 dip switch 1, 2, and 3 to obtain the shutdown delay needed. See the table below. For further details, contact Hoshizaki Technical Support at 1-800-233-1940.

Note: When the shutdown sequence begins, the compressor de-energizes immediately and then 5 minutes later the gear motor and fan motor de-energize.

WARNING

Increasing the shutdown delay allows a higher level of ice in the dispensing unit/storage bin before shutdown. This could lead to icemaker movement or ice overflow.

S1 Dip Switch

Shutdown Delay

 

 

 

NO. 1

NO. 2

NO. 3

 

 

 

 

 

OFF

OFF

OFF

0 seconds

ON

OFF

OFF

100 seconds (1.6 minutes)

OFF

ON

OFF

1100 seconds (18.3 minutes)

OFF

OFF

ON

1650 seconds (27.5 minutes)

ON

ON

OFF

2200 seconds (36.7 minutes)

 

 

 

 

OFF

ON

ON

0 seconds

ON

ON

ON

0 Seconds

35

Image 35
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFD-1001MAH-C air-cooled Specifications Nameplate RatingFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system See Fig II. Installation and Operating InstructionsChecks Before Installation How to Remove PanelsLocation SetupAdditional Warnings for Remote Air-Cooled Model Electrical ConnectionFor All Models Location Installation of Remote Condenser UnitChecks Before Installation Line Set SetupField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Connection to an R-404A Parallel Rack System Line Set InstallationRack System-Braze Connection Entire Male Fitting See , 15, or Water Supply and Drain ConnectionsIcemaker FD-1001MAH-C FD-1001MRH-C FD-1001MLH-CWater Supply FD-1001MWH-C CondenserConnection To a PotableClosed Loop FD-1001MWH-CConnection to Final Checklist Startup Infrared Sensor Check Bin Control CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Seconds 1.6 minutes Infrared Sensor Shutdown DelayCleaning Procedure III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Frequency Area Task MaintenanceDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line Page Hoshizaki AMERICA, INC