Hoshizaki FD-1001MRH(-C), FD-1001MLH(-C), FD-1001MAH(-C), FD-1001MWH(-C) Hoshizaki AMERICA, INC

Page 44

HOSHIZAKI AMERICA, INC.

618 Hwy. 74 S., Peachtree City, GA 30269 USA TEL (770) 487-2331 FAX (770) 487-3360 www.hoshizaki.com 91A2RA10A

Image 44
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Important Safety Information Serious injuryIndicates important information about the use and care UnitSpecifications Nameplate Rating FD-1001MAH-C air-cooledFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system II. Installation and Operating Instructions Checks Before InstallationHow to Remove Panels See FigSetup LocationAdditional Warnings for Remote Air-Cooled Model Electrical ConnectionFor All Models Location Installation of Remote Condenser UnitChecks Before Installation Setup Line SetField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Line Set Installation Connection to an R-404A Parallel Rack SystemRack System-Braze Connection Entire Male Fitting Water Supply and Drain Connections See , 15, orFD-1001MAH-C FD-1001MRH-C FD-1001MLH-C IcemakerFD-1001MWH-C Condenser ConnectionTo a Potable Water SupplyClosed Loop FD-1001MWH-CConnection to Final Checklist Startup Bin Control Check Infrared Sensor CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Infrared Sensor Shutdown Delay Seconds 1.6 minutesIII. Cleaning and Maintenance Cleaning and Sanitizing InstructionsCleaning Solution Cleaning ProcedureFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Solution Sanitizing Procedure InitialSanitizing Procedure Final Maintenance Frequency Area TaskDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line Page Hoshizaki AMERICA, INC