Hoshizaki FD-1001MWH(-C), FD-1001MRH(-C), FD-1001MLH(-C), FD-1001MAH(-C) FD-1001MWH-C water-cooled

Page 11

2. FD-1001MWH(-C) (water-cooled)

Unit = mm [in.]

11

Image 11
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFD-1001MAH-C air-cooled Specifications Nameplate RatingFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system See Fig II. Installation and Operating InstructionsChecks Before Installation How to Remove PanelsLocation SetupAdditional Warnings for Remote Air-Cooled Model Electrical ConnectionFor All Models Location Installation of Remote Condenser UnitChecks Before Installation Line Set SetupField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Connection to an R-404A Parallel Rack System Line Set InstallationRack System-Braze Connection Entire Male Fitting See , 15, or Water Supply and Drain ConnectionsIcemaker FD-1001MAH-C FD-1001MRH-C FD-1001MLH-CWater Supply FD-1001MWH-C CondenserConnection To a PotableClosed Loop FD-1001MWH-CConnection to Final Checklist Startup Infrared Sensor Check Bin Control CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Seconds 1.6 minutes Infrared Sensor Shutdown DelayCleaning Procedure III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Frequency Area Task MaintenanceDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line Page Hoshizaki AMERICA, INC