Hoshizaki FD-1001MAH(-C), FD-1001MRH(-C) Infrared Sensor Infrared Sensor Housing Lens

Page 38

11)Wipe down the infrared sensor's lens, (located on the bottom of the icemaker) with the cleaning solution. See Fig. 22. Next, rinse the cleaning solution off of the infrared sensor's lens with a clean, damp cloth.

Infrared Sensor

Infrared Sensor Housing

Fig. 22

Lens

 

12)Move the control switch to the "ICE" position, then move the power switch to the "ON" position. Replace the panels in their correct positions. Turn on the power supply and make ice using the solution until the icemaker stops making ice.

13)Turn off the power supply, then remove the front panel. Move the control switch to the "DRAIN" position, then replace the front panel in its correct position.

14)Turn on the power supply and allow the solution to drain for 5 minutes.

15)Turn off the power supply, then remove the front panel. Move the control switch to the "ICE" position, then replace the front panel in its correct position.

16)Open the water supply line shut-off valve, then turn on the power supply to supply water to the reservoir.

17)After the gear motor starts, turn off the power supply. Remove the front panel, then move the control switch to the "DRAIN" position. Replace the front panel in its correct position.

18)Turn on the power supply and allow the water system to drain for 5 minutes. Note: If you do not sanitize the unit, go to step 14 in "III.A.5. Sanitizing

Procedure Final."

19)Turn off the power supply, then close the water supply line shut-off valve.

38

Image 38
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Indicates important information about the use and care Important Safety InformationSerious injury UnitSpecifications Nameplate Rating FD-1001MAH-C air-cooledFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system How to Remove Panels II. Installation and Operating InstructionsChecks Before Installation See FigSetup LocationAdditional Warnings for Remote Air-Cooled Model Electrical ConnectionFor All Models Location Installation of Remote Condenser UnitChecks Before Installation Setup Line SetField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Line Set Installation Connection to an R-404A Parallel Rack SystemRack System-Braze Connection Entire Male Fitting Water Supply and Drain Connections See , 15, orFD-1001MAH-C FD-1001MRH-C FD-1001MLH-C IcemakerTo a Potable FD-1001MWH-C CondenserConnection Water SupplyClosed Loop FD-1001MWH-CConnection to Final Checklist Startup Bin Control Check Infrared Sensor CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Infrared Sensor Shutdown Delay Seconds 1.6 minutesCleaning Solution III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning ProcedureFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Solution Sanitizing Procedure InitialSanitizing Procedure Final Maintenance Frequency Area TaskDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line Page Hoshizaki AMERICA, INC