Hoshizaki FD-1001MRH(-C), FD-1001MLH(-C), FD-1001MAH(-C) Bin Control Check, Infrared Sensor Check

Page 32

K. Bin Control Check

An infrared sensor is used as the primary bin control to control the level of ice in the dispensing unit/storage bin. A mechanical bin control is used as a backup bin control.

IMPORTANT

1.Make sure the icemaker has been installed as outlined in this manual and that the water supply is on.

2.Make sure S1 Dip Switch 7 is in the "ON" position. This allows the control board to monitor the infrared sensor along with the mechanical backup bin control.

1.Infrared Sensor Check

1)Turn off the power supply.

2)Remove the front panel, top panel, and control box cover.

3)Confirm that control board S1 dip switch 1, 2, and 3 are in the proper position for your application. "See IV.K.3. Infrared Sensor Shutdown Delay."

4)Move the control switch on the control box to the "ICE" position, then move the power switch to the "ON" position.

5)Turn on the power supply to start the automatic icemaking process. The green LED on the infrared sensor turns on. This LED confirms 20V DC power to the sensor.

6)Make sure the "GM" LED on the control board is on. See Fig. 17. There is a delay of at least 30 seconds before the "GM" LED turns on after powerup. After the "GM" LED turns on, press the "SERVICE" button on the control board to bypass the 5-minute compressor delay. WARNING! Risk of electric shock. Care should be taken not to touch live terminals. The "COMP" LED turns on.

"SERVICE" Button

K6 - Connector for

Infrared Sensor

S1 Dip Switch

"COMP" LED

"GM" LED

Fig. 17

32

Image 32
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Important Safety Information Serious injuryIndicates important information about the use and care UnitSpecifications Nameplate Rating FD-1001MAH-C air-cooledFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system II. Installation and Operating Instructions Checks Before InstallationHow to Remove Panels See FigSetup LocationAdditional Warnings for Remote Air-Cooled Model Electrical ConnectionFor All Models Location Installation of Remote Condenser UnitChecks Before Installation Setup Line SetField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Line Set Installation Connection to an R-404A Parallel Rack SystemRack System-Braze Connection Entire Male Fitting Water Supply and Drain Connections See , 15, orFD-1001MAH-C FD-1001MRH-C FD-1001MLH-C IcemakerFD-1001MWH-C Condenser ConnectionTo a Potable Water SupplyClosed Loop FD-1001MWH-CConnection to Final Checklist Startup Bin Control Check Infrared Sensor CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Infrared Sensor Shutdown Delay Seconds 1.6 minutesIII. Cleaning and Maintenance Cleaning and Sanitizing InstructionsCleaning Solution Cleaning ProcedureFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Solution Sanitizing Procedure InitialSanitizing Procedure Final Maintenance Frequency Area TaskDrain the evaporator Preparing the Icemaker for Long StorageRemove the water from the icemaker water supply line Page Hoshizaki AMERICA, INC