Hoshizaki FD-1001MWH(-C), FD-1001MRH(-C), FD-1001MLH(-C), FD-1001MAH(-C) instruction manual Startup

Page 31

J. Startup

WARNING

1.All parts are factory-adjusted. Improper adjustments may adversely affect safety, performance, component life, and warranty coverage.

2.If the icemaker is turned off, wait for at least 3 minutes before restarting the icemaker to prevent damage to the compressor.

3.At startup, confirm that all internal and external connections are free of leaks.

4.On remote air-cooled model, the icemaker should have power for a minimum of 4 hours prior to startup to prevent compressor damage.

1)Open the water supply line shut-off valve(s).

2)Remove the front panel.

3)Move the control switch on the control box to the "ICE" position, then move the power switch to the "ON" position.

4)Replace the front panel in its correct position.

5)Turn on the power supply to start the automatic icemaking process.

6)Once the unit starts to produce ice, allow it to run for another 30 minutes.

7)Turn off the power supply, then remove the front panel.

8)Move the control switch to the "DRAIN" position, then replace the front panel in its correct position. Turn on the power supply and allow the water system to drain for 5 minutes.

9)Turn off the power supply, then remove the front panel.

10)Move the control switch to the "ICE" position, then replace the front panel in its correct position.

11)Pour warm water into the dispenser unit/storage bin and melt any remaining ice. Clean the dispenser unit/storage bin liner using a neutral cleaner. Rinse thoroughly after cleaning.

12)Turn on the power supply to start the automatic icemaking process.

13)Confirm bin control operation. See "II.K. Bin Control Check."

31

Image 31
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFD-1001MAH-C air-cooled Specifications Nameplate RatingFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system See Fig II. Installation and Operating InstructionsChecks Before Installation How to Remove PanelsLocation SetupFor All Models Electrical ConnectionAdditional Warnings for Remote Air-Cooled Model Checks Before Installation Installation of Remote Condenser UnitLocation Line Set SetupField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Connection to an R-404A Parallel Rack System Line Set InstallationRack System-Braze Connection Entire Male Fitting See , 15, or Water Supply and Drain ConnectionsIcemaker FD-1001MAH-C FD-1001MRH-C FD-1001MLH-CWater Supply FD-1001MWH-C CondenserConnection To a PotableConnection to FD-1001MWH-CClosed Loop Final Checklist Startup Infrared Sensor Check Bin Control CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Seconds 1.6 minutes Infrared Sensor Shutdown DelayCleaning Procedure III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Frequency Area Task MaintenanceRemove the water from the icemaker water supply line Preparing the Icemaker for Long StorageDrain the evaporator Page Hoshizaki AMERICA, INC