Hoshizaki FD-1001MWH(-C), FD-1001MRH(-C), FD-1001MLH(-C), FD-1001MAH(-C) instruction manual

Page 43

6)Turn on the power supply, then move the power switch to the "ON" position. Blow out the evaporator drain line using the compressed air or carbon dioxide supply until water stops coming out.

7)Move the power switch to the "OFF" position, then turn off the power supply. Reconnect the evaporator drain line hose.

8)Replace the front panel in its correct position.

9)Remove all ice from the dispenser unit/storage bin. Clean the dispenser unit/storage bin liner using a neutral cleaner. Rinse thoroughly after cleaning.

3.On water-cooled model only, first remove the water from the water-cooled condenser:

1)Make sure the power supply is off, then remove the front and right side panels.

2)Close the condenser water supply line shut-off valve. If connected to a closed loop system, also close the condenser return line shut-off valve.

3)Open the condenser water supply line drain valve. If connected to a closed loop system, also open the condenser return line drain valve.

4)Attach a compressed air or carbon dioxide supply to the condenser water supply line drain valve.

5)Open the water regulating valve by using a screwdriver to pry up on the spring retainer underneath the spring. While holding the valve open, blow out the condenser using the compressed air or carbon dioxide supply until water stops coming out.

6)Close the drain valve(s).

7)Replace the right side panel and front panel in their correct positions.

43

Image 43
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careFD-1001MAH-C air-cooled Specifications Nameplate RatingFD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low-side, parallel rack system Dimensions / Connections FD-1001MWH-C water-cooled FD-1001MRH-C remote air-cooled FD-1001MLH-C low side, parallel rack system See Fig II. Installation and Operating InstructionsChecks Before Installation How to Remove PanelsLocation SetupFor All Models Electrical ConnectionAdditional Warnings for Remote Air-Cooled Model Checks Before Installation Installation of Remote Condenser UnitLocation Line Set SetupField Fabricated Line Set Installation Polyol Ester POE OIL Electrical Connection Stacking Remote Condenser Units Connection to an R-404A Parallel Rack System Line Set InstallationRack System-Braze Connection Entire Male Fitting See , 15, or Water Supply and Drain ConnectionsIcemaker FD-1001MAH-C FD-1001MRH-C FD-1001MLH-CWater Supply FD-1001MWH-C CondenserConnection To a PotableConnection to FD-1001MWH-CClosed Loop Final Checklist Startup Infrared Sensor Check Bin Control CheckThumbscrew Infrared Sensor Housing Lens Mechanical Backup Bin Control Check Seconds 1.6 minutes Infrared Sensor Shutdown DelayCleaning Procedure III. Cleaning and MaintenanceCleaning and Sanitizing Instructions Cleaning SolutionFloat Switch Assembly Reservoir Cover Infrared Sensor Infrared Sensor Housing Lens Sanitizing Procedure Initial Sanitizing SolutionSanitizing Procedure Final Frequency Area Task MaintenanceRemove the water from the icemaker water supply line Preparing the Icemaker for Long StorageDrain the evaporator Page Hoshizaki AMERICA, INC