Carrier 19XL Denitions, Controls, Major PIC Components Panel Locations, PIC Component Panel, Psio

Page 11

·overtemperature

·ground fault

·current unbalance

·run state

These LEDs are further explained in the Check Starter and Troubleshooting Guide section, page 66.

Unit-Mounted Wye-Delta Starter (Optional) Ð The 19XL chiller may be equipped with a wye-delta starter mounted on the unit (Fig. 7). This starter is intended for use with low- voltage motors (under 600 v). It reduces the starting current inrush by connecting each phase of the motor windings into a wye con®guration. This occurs during the starting period when the motor is accelerating up to speed. After a time de- lay, once the motor is up to speed, the starter automatically connects the phase windings into a delta con®guration.

 

1

 

2

 

 

 

3

 

 

4

5

6

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

17

 

16

8

15

 

14

13

12

11

10

9

LEGEND

1Ð Pilot Relays

2Ð SMM Power Circuit Breaker and Voltage Calibration Potentiometer

3Ð Transistor Resistor Fault Protector (TRFP)

4Ð Transformer (T2)

5Ð Control Power Circuit Breaker

6Ð Oil Pump Circuit Breaker

7Ð Main Circuit Breaker Disconnect

8Ð Voltmeter (Optional)

9Ð Ammeter (Optional)

10Ð Current Transformers (T1, T2, T3)

11Ð Phase Monitor Relay (Optional)

12Ð Overload Unit

13Ð Starter Management Module

14Ð Starter Access Door

15Ð Control Transformer Secondary Circuit Breaker

16Ð Signal Resistor

17Ð Field Wiring Terminal Strip (TB6)

Fig. 7 Ð Wye-Delta Starter, Internal View

The memory of the PSIO and LID modules are volatile. If the battery in a module is removed or damaged, all programming will be lost.

General Ð The 19XL hermetic centrifugal liquid chiller contains a microprocessor-based control center that moni- tors and controls all operations of the chiller. The micro- processor control system matches the cooling capacity of the chiller to the cooling load while providing state-of-the-art chiller protection. The system controls cooling load within the set point plus the deadband by sensing the leaving chilled water or brine temperature, and regulating the inlet guide vane via a mechanically linked actuator motor. The guide vane is a variable ¯ow prewhirl assembly that controls the refrigeration effect in the cooler by regulating the amount of refrigerant vapor ¯ow into the compressor. An increase in guide vane opening increases capacity. A decrease in guide vane opening decreases capacity. Chiller protection is pro- vided by the processor which monitors the digital and ana- log inputs and executes capacity overrides or safety shutdowns, if required.

PIC System Components Ð The Product Integrated Control (PIC) is the control system on the chiller. See Table 1. The PIC controls the operation of the chiller by moni- toring all operating conditions. The PIC can diagnose a prob- lem and let the operator know what the problem is and what to check. It promptly positions the guide vanes to maintain leaving chilled water temperature. It can interface with aux- iliary equipment such as pumps and cooling tower fans to turn them on only when required. It continually checks all safeties to prevent any unsafe operating condition. It also regulates the oil heater while the compressor is off, and the hot gas bypass valve, if installed.

The PIC can be interfaced with the Carrier Comfort Net- work (CCN) if desired. It can communicate with other PIC- equipped chillers and other CCN devices.

The PIC consists of 3 modules housed inside the 3 major components. The component names and the control voltage contained in each component are listed below (also see Table 1):

·control center Ð all extra low-voltage wiring (24 v or less)

·power panel Ð 230 or 115 v control voltage (per job requirement)

Ðup to 600 v for oil pump power

·starter cabinet Ð chiller power wiring (per job requirement)

Table 1 Ð Major PIC Components and

Panel Locations*

De®nitions

CONTROLS

PIC COMPONENT

PANEL

LOCATION

 

Processor Sensor Input/Output Module

Control Center

(PSIO)

 

ANALOG SIGNAL Ð An analog signal varies in propor- tion to the monitored source. It quanti®es values between operating limits. (Example: A temperature sensor is an ana- log device because its resistance changes in proportion to the temperature, generating many values.)

DIGITAL SIGNAL Ð A digital (discrete) signal is a 2-position representation of the value of a monitored source. (Ex- ample: A switch is a digital device because it only indicates whether a value is above or below a set point or boundary by generating an on/off, high/low, or open/closed signal.)

VOLATILE MEMORY Ð Volatile memory is memory in- capable of being sustained if power is lost and subsequently restored.

Starter Management Module (SMM)

Starter Cabinet

Local Interface Device (LID)

Control Center

6-Pack Relay Board

Control Center

8-Input Modules (Optional)

Control Center

Oil Heater Contactor (1C)

Power Panel

Oil Pump Contactor (2C)

Power Panel

Hot Gas Bypass Relay (3C) (Optional)

Power Panel

Control Transformers (T1-T4)

Power Panel

Control and Oil Heater Voltage Selector (S1)

Power Panel

Temperature Sensors

See Fig. 8

Pressure Transducers

See Fig. 8

 

 

*See Fig. 5, 6, and Fig. 8-12.

 

11

Image 11
Contents Safety Considerations Start-Up, Operation, and Maintenance InstructionsContents Contents Abbreviations and Explanations IntroductionMOTOR/OIL Refrigeration Cooling Cycle Chiller FamiliarizationRefrigeration Cycle 19XL Rear View Cooler Pressure Schrader Fitting Take-Apart Rabbet Fit ConnectorCooler In/Out Temperature Sensors Condenser In/Out Temperature SensorsRefrigerant Motor Cooling and Oil Cooling Cycles Lubrication CycleLubrication System Unit-Mounted Solid-State Starter Optional Starting EquipmentPIC Component Panel DenitionsControls Major PIC Components Panel LocationsPressure Transducer, Typical 19XL Controls and Sensor LocationsControl and OIL Heater Voltage Selector S1 Power Panel with OptionsSelect LID Operation and Menus FigGeneral Override Operations − Example of Point Status Screen Status01Example of Time Schedule Operation Screen 19XL Menu Structure 19XL Service Menu Structure 19XL Service Menu Structure Example of Set Point Screen SetpointMenu Status Select Description Range Units Reference Point Name Alarm HistoryLID Screens Example 1 Ð STATUS01 Display ScreenMenu Example 2 Ð STATUS02 Display ScreenExample 3 Ð STATUS03 Display Screen Example 4 Ð Setpoint Display ScreenICE Build Termination Example 5 Ð Configuration Config Display ScreenExample 6 Ð LEAD/LAG Configuration Display Screen ECW Control OptionExample 7 Ð SERVICE1 Display Screen Menu Service Example 8 Ð SERVICE2 Display ScreenSpare Alert Enable Example 9 Ð SERVICE3 Display ScreenBearing Temperature Example 10 Ð Maintenance MAINT01 Display ScreenExample 11 Ð Maintenance MAINT02 Display Screen Discharge TemperatureDescription RANGE/STATUS Units Reference Point Name Example 12 Ð Maintenance MAINT03 Display ScreenExample 13 Ð Maintenance MAINT04 Display Screen PIC System Functions Page Protective Safety Limits and Control Settings Capacity Overrides Page Page Hot Gas Bypass Lead/Lag ControlECW HgbpPage Cent Capacity Ice Build ControlPage To LOG on Example of Attach to Network Device ScreenSequence Fig START-UP/SHUTDOWN/RECYCLERecycle Restart Delta T Equipment Required Using the Optional Storage Tank and PumpoutBefore Initial START-UP Job Data Required19XL Leak Test Procedures Page Ð HCFC-22 Pressure Ð Temperature C Ð HCFC-22 Pressure Ð Temperature FTemperature Pressure Ð HFC-134a Pressure Ð Temperature FÐ HFC-134a Pressure Ð Temperature C Page Check Optional Pumpout Compressor Water Pip Inspect WiringMECHANICAL-TYPE Starters Check StarterBENSHAW, INC. SOLID-STATE Starter Benshaw, Inc. Solid-State Starter Power StackSet Up Chiller Control Conguration Power Up the Controls and Check the Oil HeaterLoad Surge Prevention Occurs TOO Soon Occurs TOO Late Volt Motor Code Amps Correction Factors For 19XL MotorsTests to be Devices Tested Performed Charge Refrigerant into Chiller19XL Chiller Equalization Without PUMP- OUT Unit Control Test Menu FunctionsSize Refrigerant Charges19XL Total Refrigerant Charge CoolerCheck Rotation Initial START-UPDry Run to Test Start-Up Sequence Operator Duties Check Oil Pressure and Compressor StopCalibrate Motor Current Operating InstructionsTo Stop the Chiller Plant Tstat Pumpout and Refrigerant Transfer ProceduresOperating the Optional Pumpout Compressor Transfer Refrigerant from Storage Tank to ChillerTransfer the Refrigerant from Chiller to Storage Tank Chillers with Isolation ValvesReturn Refrigerant to Normal Operating Conditions General MaintenanceTest After Service, Repair, or Major Leak Ð If Guide Vane Actuator Linkage Weekly MaintenanceTo Change the OIL Scheduled MaintenanceCheck Safety and Operating Controls Monthly Inspect the Heat Exchanger Tubes Compressor Bearing and Gear MaintenOptional Pumpout System Controls Troubleshooting Guide MAINT04 MAINT01MAINT02 MAINT03Timing OUT or Timed OUT Shutdown with ON/OFF/RESET-OFFAutorestart in Progress Recycle ShutdownNormal or AUTO.-RESTART LOW Chilled Water Compressor Jumpstart and Refrigerant Protection Normal RUN with RESET, TEMPERATURE, or DemandLimited Normal RUN Overrides Active AlertsOUT-OF-RANGE Sensor Failures Protective Limit Chiller Protect Limit FaultsSpare Sensor Alert Messages Chiller AlertsDESCRIPTION/MALFUNCTION Probable CAUSE/REMEDY Other PROBLEMS/MALFUNCTIONSTemperature Voltage Resistance Drop Ð Thermistor Temperature F vs Resistance/Voltage DropÐ Thermistor Temperature C vs Resistance/Voltage Drop Input Options Module Control ModulesModule Address Options Module Starter Management Module SMM FigProcessor Module Psio Fig Switch Options Setting Module InstallationTypical Benshaw, Inc. Solid-State Starter internal View Page Page SCR Benshaw, Inc. Solid-State Starter Troubleshooting GuideProblem Probable Causes Area of Correction RV1Condenser Heat Exchanger DataAdditional Data for Marine Waterboxes Cooler1034 kPa Waterbox Cover WeightsCoolers CondensersOptional Pumpout System Electrical Data Compressor/Motor WeightsCompressor Weights Compressor Fits and Clearances ``Z Compressor Assembly TorquesDescription Torque Ft-lbEXT CLRCOM CommPage CLR Page Chiller Power Panel, Starter Assembly Motor Wiring Schematic Chiller Power Panel, Starter Assembly Motor Wiring Schematic HPS PMRPOT GFRTypical Wye-Delta Unit Mounted Starter Wiring Schematic Index Index Copyright 1996 Carrier Corporation

19XL specifications

The Carrier 19XL is a highly regarded commercial heating and cooling solution, designed to provide optimum performance and energy efficiency in various applications. This rooftop unit is engineered to meet the diverse needs of businesses, making it an ideal choice for those requiring reliable climate control in their facilities.

One of the standout features of the Carrier 19XL is its advanced cooling and heating capabilities. The unit utilizes a high-efficiency scroll compressor that ensures a quieter operation and improved reliability. The system can operate across a wide range of temperatures, making it versatile for various climates. Additionally, it offers both cooling and heating options, allowing for year-round comfort.

Energy efficiency is a focal point of the 19XL design. With an impressive Seasonal Energy Efficiency Ratio (SEER) and Heating Seasonal Performance Factor (HSPF), this unit not only helps reduce energy costs but also supports environmental sustainability initiatives. The unit is equipped with environmentally friendly refrigerants, further contributing to lower greenhouse gas emissions.

The Carrier 19XL features a user-friendly control system, allowing for easy monitoring and management of the unit's performance. This control system is designed to maximize energy savings, offering features such as demand control ventilation and integrated economizers that facilitate the use of outdoor air for cooling, reducing reliance on mechanical systems when conditions allow.

Construction-wise, the Carrier 19XL is built to withstand tough environmental conditions. Its robust cabinet is made from galvanized steel, providing durability and protection against the elements. The design also includes insulation to minimize noise levels, creating a more comfortable indoor environment.

Maintenance is a key consideration in the design of the 19XL. The unit features accessible service ports and a simplified access panel, allowing technicians to perform routine maintenance with ease. This proactive design helps ensure the longevity of the system and minimizes downtime, keeping operations running smoothly.

In summary, the Carrier 19XL is an exceptional choice for commercial heating and cooling needs. With its energy-efficient features, advanced technology, and durable construction, it stands out as a reliable solution for businesses looking for sustainable climate control options.