Carrier 19XL specifications Example of Attach to Network Device Screen, To LOG on

Page 38

ATTACHING TO OTHER CCN MODULES Ð If the chiller PSIO has been connected to a CCN Network or other PIC controlled chillers through CCN wiring, the LID can be used to view or change parameters on the other controllers. Other PIC chillers can be viewed and set points changed (if the other unit is in CCN control), if desired from this particular LID module.

To view the other devices, move to the ATTACH TO NETWORK DEVICE table. Move the highlight bar to any

device number. Press the SELECT softkey to change the

bus number and address of the module to be viewed. Press EXIT softkey to move back to the ATTACH TO NET- WORK DEVICE table. If the module number is not valid, the ``COMMUNICATION FAILURE'' message will show and a new address number should be entered or the wiring checked. If the model is communicating properly, the ``UP- LOAD IN PROGRESS'' message will ¯ash and the new mod- ule can now be viewed.

Whenever there is a question regarding which module on the LID is currently being shown, check the device name descriptor on the upper left hand corner of the LID screen. See Fig. 22.

When the CCN device has been viewed, the ATTACH TO NETWORK DEVICE table should now be used to attach to the PIC that is on the chiller. Move to the ATTACH TO NETWORK DEVICE table and press the

ATTACH softkey to upload the LOCAL device. The PSIO

for the 19XL will now be uploaded.

NOTE: The LID will not automatically reattach to the PSIO

module on the chiller. Press the ATTACH softkey to attach

to LOCAL DEVICE and view the chiller PSIO.

Fig. 22 Ð Example of Attach to Network

Device Screen

Service Operation Ð An overview of the menu- driven programs available for Service Operation is shown in Fig. 17.

TO LOG ON

1.On the Menu screen, press SERVICE . The keys now correspond to the numerals 1, 2, 3, 4.

2.Press the four digits of your password, one at a time. An asterisk (*) appears as you enter each digit.

The menu bar (Next-Previous-Select-Exit) is displayed to indicate that you have successfully logged on.

If the password is entered incorrectly, an error message is displayed. If this occurs, return to Step 1 and try logging on again.

NOTE: The initial factory set password is 1-1-1-1.

TO LOG OFF Ð Access the Log Out of Device table of the Service menu in order to password-protect the Service menu. The LID will automatically sign off and password-protect itself if a key is not pressed for 15 minutes. The LID default screen is then displayed.

HOLIDAY SCHEDULING (Fig. 23) Ð The time schedules may be con®gured for special operation during a holiday period. When modifying a time period, the ``H'' at the end of the days of the week ®eld signi®es that the period is ap- plicable to a holiday. (See Fig. 18.)

The Broadcast function must be activated for the holidays con®gured in the Holidef tables to work properly. Access the Brodefs table in the Equipment Con®guration table and answer ``Yes'' to the activated function. However, when the chiller is connected to a CCN Network, only one chiller or CCN device can be con®gured to be the broadcast device. The controller that is con®gured to be the broadcaster is the device responsible for transmitting holiday, time, and daylight- savings dates throughout the network.

To view or change the holiday periods for up to 18 dif- ferent holidays, perform the following operation:

1.At the Menu screen, press SERVICE to access the Serv- ice menu.

2.If not logged on, follow the instructions for To Log On or To Log Off. Once logged on, press NEXT un- til Equipment Con®guration is highlighted.

3.Once Equipment Con®guration is highlighted, press SELECT to access.

4.Press NEXT until Holidef is highlighted. This is the Holiday De®nition table.

5.Press SELECT to enter the Data Table Select screen. This screen lists 18 holiday tables.

38

Image 38
Contents Start-Up, Operation, and Maintenance Instructions Safety ConsiderationsContents Contents Introduction Abbreviations and ExplanationsMOTOR/OIL Refrigeration Cooling Cycle Chiller FamiliarizationRefrigeration Cycle 19XL Rear View Condenser In/Out Temperature Sensors Take-Apart Rabbet Fit ConnectorCooler In/Out Temperature Sensors Cooler Pressure Schrader FittingLubrication Cycle Refrigerant Motor Cooling and Oil Cooling CyclesLubrication System Starting Equipment Unit-Mounted Solid-State Starter OptionalMajor PIC Components Panel Locations DenitionsControls PIC Component Panel19XL Controls and Sensor Locations Pressure Transducer, TypicalPower Panel with Options Control and OIL Heater Voltage Selector S1Select LID Operation and Menus FigGeneral − Example of Point Status Screen Status01 Override OperationsExample of Time Schedule Operation Screen 19XL Menu Structure 19XL Service Menu Structure 19XL Service Menu Structure Setpoint Example of Set Point ScreenExample 1 Ð STATUS01 Display Screen Description Range Units Reference Point Name Alarm HistoryLID Screens Menu Status SelectExample 4 Ð Setpoint Display Screen Example 2 Ð STATUS02 Display ScreenExample 3 Ð STATUS03 Display Screen MenuECW Control Option Example 5 Ð Configuration Config Display ScreenExample 6 Ð LEAD/LAG Configuration Display Screen ICE Build TerminationExample 7 Ð SERVICE1 Display Screen Example 9 Ð SERVICE3 Display Screen Example 8 Ð SERVICE2 Display ScreenSpare Alert Enable Menu ServiceDischarge Temperature Example 10 Ð Maintenance MAINT01 Display ScreenExample 11 Ð Maintenance MAINT02 Display Screen Bearing TemperatureDescription RANGE/STATUS Units Reference Point Name Example 12 Ð Maintenance MAINT03 Display ScreenExample 13 Ð Maintenance MAINT04 Display Screen PIC System Functions Page Protective Safety Limits and Control Settings Capacity Overrides Page Page Hgbp Lead/Lag ControlECW Hot Gas BypassPage Ice Build Control Cent CapacityPage Example of Attach to Network Device Screen To LOG onSTART-UP/SHUTDOWN/RECYCLE Sequence FigRecycle Restart Delta T Job Data Required Using the Optional Storage Tank and PumpoutBefore Initial START-UP Equipment Required19XL Leak Test Procedures Page Ð HCFC-22 Pressure Ð Temperature F Ð HCFC-22 Pressure Ð Temperature CTemperature Pressure Ð HFC-134a Pressure Ð Temperature FÐ HFC-134a Pressure Ð Temperature C Page Inspect Wiring Check Optional Pumpout Compressor Water PipCheck Starter MECHANICAL-TYPE StartersBenshaw, Inc. Solid-State Starter Power Stack BENSHAW, INC. SOLID-STATE StarterPower Up the Controls and Check the Oil Heater Set Up Chiller Control CongurationLoad Surge Prevention Occurs TOO Soon Occurs TOO Late Amps Correction Factors For 19XL Motors Volt Motor CodeControl Test Menu Functions Charge Refrigerant into Chiller19XL Chiller Equalization Without PUMP- OUT Unit Tests to be Devices Tested PerformedCooler Refrigerant Charges19XL Total Refrigerant Charge SizeCheck Rotation Initial START-UPDry Run to Test Start-Up Sequence Operating Instructions Check Oil Pressure and Compressor StopCalibrate Motor Current Operator DutiesTo Stop the Chiller Plant Transfer Refrigerant from Storage Tank to Chiller Pumpout and Refrigerant Transfer ProceduresOperating the Optional Pumpout Compressor TstatChillers with Isolation Valves Transfer the Refrigerant from Chiller to Storage TankReturn Refrigerant to Normal Operating Conditions General MaintenanceTest After Service, Repair, or Major Leak Ð If Weekly Maintenance Guide Vane Actuator LinkageTo Change the OIL Scheduled MaintenanceCheck Safety and Operating Controls Monthly Compressor Bearing and Gear Mainten Inspect the Heat Exchanger TubesOptional Pumpout System Controls Troubleshooting Guide MAINT03 MAINT01MAINT02 MAINT04Shutdown with ON/OFF/RESET-OFF Timing OUT or Timed OUTAutorestart in Progress Recycle ShutdownNormal or AUTO.-RESTART LOW Chilled Water Normal RUN with RESET, TEMPERATURE, or Demand Compressor Jumpstart and Refrigerant ProtectionLimited Normal RUN Overrides Active AlertsOUT-OF-RANGE Sensor Failures Chiller Protect Limit Faults Protective LimitChiller Alerts Spare Sensor Alert MessagesOther PROBLEMS/MALFUNCTIONS DESCRIPTION/MALFUNCTION Probable CAUSE/REMEDYÐ Thermistor Temperature F vs Resistance/Voltage Drop Temperature Voltage Resistance DropÐ Thermistor Temperature C vs Resistance/Voltage Drop Input Options Module Control ModulesModule Address Options Module Starter Management Module SMM FigProcessor Module Psio Fig Installation Switch Options Setting ModuleTypical Benshaw, Inc. Solid-State Starter internal View Page Page RV1 Benshaw, Inc. Solid-State Starter Troubleshooting GuideProblem Probable Causes Area of Correction SCRCooler Heat Exchanger DataAdditional Data for Marine Waterboxes CondenserCondensers Waterbox Cover WeightsCoolers 1034 kPaOptional Pumpout System Electrical Data Compressor/Motor WeightsCompressor Weights Compressor Fits and Clearances Ft-lb Compressor Assembly TorquesDescription Torque ``ZComm CLRCOM EXTPage CLR Page Chiller Power Panel, Starter Assembly Motor Wiring Schematic Chiller Power Panel, Starter Assembly Motor Wiring Schematic GFR PMRPOT HPSTypical Wye-Delta Unit Mounted Starter Wiring Schematic Index Index Copyright 1996 Carrier Corporation

19XL specifications

The Carrier 19XL is a highly regarded commercial heating and cooling solution, designed to provide optimum performance and energy efficiency in various applications. This rooftop unit is engineered to meet the diverse needs of businesses, making it an ideal choice for those requiring reliable climate control in their facilities.

One of the standout features of the Carrier 19XL is its advanced cooling and heating capabilities. The unit utilizes a high-efficiency scroll compressor that ensures a quieter operation and improved reliability. The system can operate across a wide range of temperatures, making it versatile for various climates. Additionally, it offers both cooling and heating options, allowing for year-round comfort.

Energy efficiency is a focal point of the 19XL design. With an impressive Seasonal Energy Efficiency Ratio (SEER) and Heating Seasonal Performance Factor (HSPF), this unit not only helps reduce energy costs but also supports environmental sustainability initiatives. The unit is equipped with environmentally friendly refrigerants, further contributing to lower greenhouse gas emissions.

The Carrier 19XL features a user-friendly control system, allowing for easy monitoring and management of the unit's performance. This control system is designed to maximize energy savings, offering features such as demand control ventilation and integrated economizers that facilitate the use of outdoor air for cooling, reducing reliance on mechanical systems when conditions allow.

Construction-wise, the Carrier 19XL is built to withstand tough environmental conditions. Its robust cabinet is made from galvanized steel, providing durability and protection against the elements. The design also includes insulation to minimize noise levels, creating a more comfortable indoor environment.

Maintenance is a key consideration in the design of the 19XL. The unit features accessible service ports and a simplified access panel, allowing technicians to perform routine maintenance with ease. This proactive design helps ensure the longevity of the system and minimizes downtime, keeping operations running smoothly.

In summary, the Carrier 19XL is an exceptional choice for commercial heating and cooling needs. With its energy-efficient features, advanced technology, and durable construction, it stands out as a reliable solution for businesses looking for sustainable climate control options.