Carrier 19XL specifications Check Optional Pumpout Compressor Water Pip, Inspect Wiring

Page 47

Chiller Dehydration Ð Dehydration is recommended if the chiller has been open for a considerable period of time, if the chiller is known to contain moisture, or if there has been a complete loss of chiller holding charge or refrigerant pressure.

Do not start or megohm test the compressor motor or oil pump motor, even for a rotation check, if the chiller is under dehydration vacuum. Insulation breakdown and severe damage may result.

Dehydration is readily accomplished at room tempera- tures. Use of a cold trap (Fig. 29) may substantially reduce the time required to complete the dehydration. The higher the room temperature, the faster dehydration takes place. At low room temperatures, a very deep vacuum is required for boiling off any moisture. If low ambient temperatures are involved, contact a quali®ed service representative for the dehydration techniques required.

Perform dehydration as follows:

1.Connect a high capacity vacuum pump (5 cfm [.002 m 3/s] or larger is recommended) to the refrigerant charging valve (Fig. 2A or 2B). Tubing from the pump to the chiller should be as short and as large a diameter as possible to provide least resistance to gas ¯ow.

2.Use an absolute pressure manometer or a wet bulb vacuum indicator to measure the vacuum. Open the shutoff valve to the vacuum indicator only when taking a reading. Leave the valve open for 3 minutes to allow the indicator vacuum to equalize with the chiller vacuum.

3.Open all isolation valves (if present), if the entire chiller is to be dehydrated.

4.With the chiller ambient temperature at 60 F (15.6 C) or higher, operate the vacuum pump until the manometer reads 29.8 in. Hg vac, ref 30 in. bar. (0.1 psia) (±100.61 kPa) or a vacuum indicator reads 35 F (1.7 C). Operate the pump an additional 2 hours.

Do not apply greater vacuum than 29.82 in. Hg vac (757.4 mm Hg) or go below 33 F (.56 C) on the wet bulb vacuum indicator. At this temperature/pressure, isolated pockets of moisture can turn into ice. The slow rate of evaporation (sublimination) of ice at these low temperatures/ pressures greatly increases dehydration time.

5.Valve off the vacuum pump, stop the pump, and record the instrument reading.

6.After a 2-hour wait, take another instrument reading. If the reading has not changed, dehydration is complete. If the reading indicates vacuum loss, repeat Steps 4 and 5.

7.If the reading continues to change after several attempts, perform a leak test up to the maximum 230 psig (1585 kPa) pressure. Locate and repair the leak, and re- peat dehydration.

Fig. 29 Ð Dehydration Cold Trap

Inspect Water Piping Ð Refer to piping diagrams pro- vided in the certi®ed drawings, and the piping instructions in the 19XL Installation Instructions manual. Inspect the piping to the cooler and condenser. Be sure that ¯ow direc- tions are correct and that all piping speci®cations have been met.

Piping systems must be properly vented, with no stress on waterbox nozzles and covers. Water ¯ows through the cooler and condenser must meet job requirements. Measure the pres- sure drop across cooler and across condenser.

Water must be within design limits, clean, and treated to ensure proper chiller performance and reduce the potential of tubing damage due to corrosion, scaling, or erosion. Carrier assumes no responsibility for chiller dam- age resulting from untreated or improperly treated water.

Check Optional Pumpout Compressor Water Pip-

ing Ð If the optional storage tank and/or pumpout system are installed, check to ensure the pumpout condenser water has been piped in. Check for ®eld-supplied shutoff valves and controls as speci®ed in the job data. Check for refrig- erant leaks on ®eld-installed piping. See Fig. 27 and 28.

Check Relief Devices Ð Be sure that relief devices have been piped to the outdoors in compliance with the lat- est edition of ANSI/ASHRAE Standard 15 and applicable local safety codes. Piping connections must allow for access to the valve mechanism for periodic inspection and leak testing.

19XL relief valves are set to relieve at the 300 psig (2068 kPa) chiller design pressure.

Inspect Wiring

Do not check voltage supply without proper equipment and precautions. Serious injury may result. Follow power company recommendations.

Do not apply any kind of test voltage, even for a rota- tion check, if the chiller is under a dehydration vacuum. Insulation breakdown and serious damage may result.

1.Examine wiring for conformance to job wiring dia- grams and to all applicable electrical codes.

2.On low-voltage compressors (600 v or less) connect voltmeter across the power wires to the compressor starter and measure the voltage. Compare this reading with the voltage rating on the compressor and starter nameplates.

3.Compare the ampere rating on the starter nameplate with the compressor nameplate. The overload trip amps must be 108% to 120% of the rated load amps.

4.The starter for a centrifugal compressor motor must con- tain the components and terminals required for PIC refrigeration control. Check certi®ed drawings.

5.Check the voltage to the following components and compare to the nameplate values: oil pump contact, pumpout compressor starter, and power panel.

47

Image 47
Contents Safety Considerations Start-Up, Operation, and Maintenance InstructionsContents Contents Abbreviations and Explanations IntroductionMOTOR/OIL Refrigeration Cooling Cycle Chiller FamiliarizationRefrigeration Cycle 19XL Rear View Cooler Pressure Schrader Fitting Take-Apart Rabbet Fit ConnectorCooler In/Out Temperature Sensors Condenser In/Out Temperature SensorsRefrigerant Motor Cooling and Oil Cooling Cycles Lubrication CycleLubrication System Unit-Mounted Solid-State Starter Optional Starting EquipmentPIC Component Panel DenitionsControls Major PIC Components Panel LocationsPressure Transducer, Typical 19XL Controls and Sensor LocationsControl and OIL Heater Voltage Selector S1 Power Panel with OptionsSelect LID Operation and Menus FigGeneral Override Operations − Example of Point Status Screen Status01Example of Time Schedule Operation Screen 19XL Menu Structure 19XL Service Menu Structure 19XL Service Menu Structure Example of Set Point Screen SetpointMenu Status Select Description Range Units Reference Point Name Alarm HistoryLID Screens Example 1 Ð STATUS01 Display ScreenMenu Example 2 Ð STATUS02 Display ScreenExample 3 Ð STATUS03 Display Screen Example 4 Ð Setpoint Display ScreenICE Build Termination Example 5 Ð Configuration Config Display ScreenExample 6 Ð LEAD/LAG Configuration Display Screen ECW Control OptionExample 7 Ð SERVICE1 Display Screen Menu Service Example 8 Ð SERVICE2 Display ScreenSpare Alert Enable Example 9 Ð SERVICE3 Display ScreenBearing Temperature Example 10 Ð Maintenance MAINT01 Display ScreenExample 11 Ð Maintenance MAINT02 Display Screen Discharge TemperatureDescription RANGE/STATUS Units Reference Point Name Example 12 Ð Maintenance MAINT03 Display ScreenExample 13 Ð Maintenance MAINT04 Display Screen PIC System Functions Page Protective Safety Limits and Control Settings Capacity Overrides Page Page Hot Gas Bypass Lead/Lag ControlECW HgbpPage Cent Capacity Ice Build ControlPage To LOG on Example of Attach to Network Device ScreenSequence Fig START-UP/SHUTDOWN/RECYCLERecycle Restart Delta T Equipment Required Using the Optional Storage Tank and PumpoutBefore Initial START-UP Job Data Required19XL Leak Test Procedures Page Ð HCFC-22 Pressure Ð Temperature C Ð HCFC-22 Pressure Ð Temperature FTemperature Pressure Ð HFC-134a Pressure Ð Temperature FÐ HFC-134a Pressure Ð Temperature C Page Check Optional Pumpout Compressor Water Pip Inspect WiringMECHANICAL-TYPE Starters Check StarterBENSHAW, INC. SOLID-STATE Starter Benshaw, Inc. Solid-State Starter Power StackSet Up Chiller Control Conguration Power Up the Controls and Check the Oil HeaterLoad Surge Prevention Occurs TOO Soon Occurs TOO Late Volt Motor Code Amps Correction Factors For 19XL MotorsTests to be Devices Tested Performed Charge Refrigerant into Chiller19XL Chiller Equalization Without PUMP- OUT Unit Control Test Menu FunctionsSize Refrigerant Charges19XL Total Refrigerant Charge CoolerCheck Rotation Initial START-UPDry Run to Test Start-Up Sequence Operator Duties Check Oil Pressure and Compressor StopCalibrate Motor Current Operating InstructionsTo Stop the Chiller Plant Tstat Pumpout and Refrigerant Transfer ProceduresOperating the Optional Pumpout Compressor Transfer Refrigerant from Storage Tank to ChillerTransfer the Refrigerant from Chiller to Storage Tank Chillers with Isolation ValvesReturn Refrigerant to Normal Operating Conditions General MaintenanceTest After Service, Repair, or Major Leak Ð If Guide Vane Actuator Linkage Weekly MaintenanceTo Change the OIL Scheduled MaintenanceCheck Safety and Operating Controls Monthly Inspect the Heat Exchanger Tubes Compressor Bearing and Gear MaintenOptional Pumpout System Controls Troubleshooting Guide MAINT04 MAINT01MAINT02 MAINT03Timing OUT or Timed OUT Shutdown with ON/OFF/RESET-OFFAutorestart in Progress Recycle ShutdownNormal or AUTO.-RESTART LOW Chilled Water Compressor Jumpstart and Refrigerant Protection Normal RUN with RESET, TEMPERATURE, or DemandLimited Normal RUN Overrides Active AlertsOUT-OF-RANGE Sensor Failures Protective Limit Chiller Protect Limit FaultsSpare Sensor Alert Messages Chiller AlertsDESCRIPTION/MALFUNCTION Probable CAUSE/REMEDY Other PROBLEMS/MALFUNCTIONSTemperature Voltage Resistance Drop Ð Thermistor Temperature F vs Resistance/Voltage DropÐ Thermistor Temperature C vs Resistance/Voltage Drop Input Options Module Control ModulesModule Address Options Module Starter Management Module SMM FigProcessor Module Psio Fig Switch Options Setting Module InstallationTypical Benshaw, Inc. Solid-State Starter internal View Page Page SCR Benshaw, Inc. Solid-State Starter Troubleshooting GuideProblem Probable Causes Area of Correction RV1Condenser Heat Exchanger DataAdditional Data for Marine Waterboxes Cooler1034 kPa Waterbox Cover WeightsCoolers CondensersOptional Pumpout System Electrical Data Compressor/Motor WeightsCompressor Weights Compressor Fits and Clearances ``Z Compressor Assembly TorquesDescription Torque Ft-lbEXT CLRCOM CommPage CLR Page Chiller Power Panel, Starter Assembly Motor Wiring Schematic Chiller Power Panel, Starter Assembly Motor Wiring Schematic HPS PMRPOT GFRTypical Wye-Delta Unit Mounted Starter Wiring Schematic Index Index Copyright 1996 Carrier Corporation

19XL specifications

The Carrier 19XL is a highly regarded commercial heating and cooling solution, designed to provide optimum performance and energy efficiency in various applications. This rooftop unit is engineered to meet the diverse needs of businesses, making it an ideal choice for those requiring reliable climate control in their facilities.

One of the standout features of the Carrier 19XL is its advanced cooling and heating capabilities. The unit utilizes a high-efficiency scroll compressor that ensures a quieter operation and improved reliability. The system can operate across a wide range of temperatures, making it versatile for various climates. Additionally, it offers both cooling and heating options, allowing for year-round comfort.

Energy efficiency is a focal point of the 19XL design. With an impressive Seasonal Energy Efficiency Ratio (SEER) and Heating Seasonal Performance Factor (HSPF), this unit not only helps reduce energy costs but also supports environmental sustainability initiatives. The unit is equipped with environmentally friendly refrigerants, further contributing to lower greenhouse gas emissions.

The Carrier 19XL features a user-friendly control system, allowing for easy monitoring and management of the unit's performance. This control system is designed to maximize energy savings, offering features such as demand control ventilation and integrated economizers that facilitate the use of outdoor air for cooling, reducing reliance on mechanical systems when conditions allow.

Construction-wise, the Carrier 19XL is built to withstand tough environmental conditions. Its robust cabinet is made from galvanized steel, providing durability and protection against the elements. The design also includes insulation to minimize noise levels, creating a more comfortable indoor environment.

Maintenance is a key consideration in the design of the 19XL. The unit features accessible service ports and a simplified access panel, allowing technicians to perform routine maintenance with ease. This proactive design helps ensure the longevity of the system and minimizes downtime, keeping operations running smoothly.

In summary, the Carrier 19XL is an exceptional choice for commercial heating and cooling needs. With its energy-efficient features, advanced technology, and durable construction, it stands out as a reliable solution for businesses looking for sustainable climate control options.