31
30
29
DP1
Figure 53. Motor Assembly Installed
Assembly Hoses
1.Attach male quick coupler (17) and adapter (16) to the end of hose (15). Attach tee (12) to the opposite end of hose.
2.Attach male quick coupler (17) and adapter (16) to the end of second hose (15). Attach check valve (14), nipple (13) and tee (12) to the opposite end of hose.
NOTE: Make sure flow indicator arrow on the side of the check valve (14) is pointing in the correct direction. See Figure 54
3.Install check valve (14) and two nipples (13) between the two tees (12).
NOTE: Make sure flow indicator arrow on the side of the check valve (14) is pointing in the correct direction.
4.Place hose assembly around center plate of shredder and drape quick couplers over the front of the shredder. See Figure 54 and Figure 55.
5.Make sure hose with check valve is on the right side of the center plate.
Figure 54. Hose Assembly
6.Route hose (11) from the IN side of the motor between shredder and rockshaft and attach it to tee (12) on the left side of the center plate.
7.Route hose (11) from the OUT side of the motor between shredder and rockshaft and attach it to tee (12) on the right side of the center plate.
| RETURN |
|
PRESSURE |
| Center Plate |
|
| |
|
| Check |
|
| Valve |
11 |
|
|
|
| ht |
|
| Rig |
ft |
|
|
Le |
|
|
| IN | 11 |
| OUT | |
|
| |
|
| DP2 |
Figure 55. Hose Routing
44 Assembly | MAN0943 (07/12/2011) |
|
|