Shindaiwa DG1000MI Connecting Cable, Load Connection Terminal Plate 3-Phase For 3-Phase Load

Page 21

7.2 Connecting Cable

Danger

:Electrical Shock

￿Before connecting or disconnecting a load cable from output terminals, always turn a circuit breaker to OFF position, stop the engine, and remove the engine key. A person performing the maintenance should always keep the key.

Caution

:Fire

￿Do not connect AC output to any indoor wiring.

<Caution>

￿Divide loads into 3 circuits proportionally as possible, when using the maximum output power especially, and connect them to each phase (R,S,T) respectively.

￿Be careful to limit the current under the rated current per the phase .

￿The 1-Phase terminals and receptacles output power are originated from the R and T Phase output powers.

7.2.1Load Connection Terminal Plate (3-Phase)

7.2.1.1 For 3-Phase Load

Terminal Voltage: 200V/220V (or 400V/440V) at 50Hz/60Hz

R S T O

Load

7.2.1.2 For 1-Phase Load(1)

Terminal Voltage: 115V/127V (or 230V/254V) at 50Hz/60Hz

R S T O

Load Load Load

- 21 -

Image 21
Contents DG1000MI Introduction Suffocation from exhaust fume Safety GuidelinesElectrical Shock InjuriesExplosion Injuries to eyes and skinFire BurnsInjuries Location of Warning labels Specification Matrix SpecificationsUse Parts Ambient ConditionExternal view Control panel Monitor Display EquipmentEngine Oil Monitoring Lamp for oil pressure low Injuries Water Temperature Gauge Battery Charge Monitoring Lamp charge lampGauges Hour Meter built into the TachometerGenerator Gauges Fuel GaugeAmp Meter Frequency MeterSwitch Starter Switch Panel Light / Pilot LampEmergency Stop button Thermal Relay Amp Meter Changeover SwitchEarth Leakage Relay Unit Voltage Regulator and Throttle LeverFuel Line Changeover Valve 3-way valve Using fuel from built-in fuel tank< > Transportation Transport and Installation Lifting Equipment TransportationInstallation ConnectionSelecting Cable Electrical damages Connecting Cable Load Connection Terminal Plate 3-Phase For 3-Phase LoadFor 1-Phase Load1 2 1-Phase Output Terminals & Receptacles For 1-Phase Load2Grounding Work Earth Leakage Relay and GroundingOperation Check Electrical Shock Earth leakage breaker relay has activated Initialization and pre-checkElectrical Shock Injuries Fire BurnsChecking Engine Oil Selecting proper engine oilEngine Oil Capacity Checking Coolant/water Checking Radiator / Adding waterChecking Coolant reservoir tank / Adding coolant Checking Fan Belt Coolant CapacityTension Condition Checking FuelChecking Fuel, Engine Oil, and Water leakage Checking BatteryReplacing the battery Initializing / preparation OperationFrequency Adjust Screw Damages to the property 200/400 Voltage Changeover Dual Voltage SystemDuring operation Refer to 7-2. Connecting cableProtection Features Feature ListStopping the Generator During Operation section Connecting to External Fuel TankMaintenance Generator side Engine SideReplace, refer to 8-1 Checking Engine Oil 10.1 Oil ChangeCleaning / Changing Air Filter Element Draining Water from Water Separator Cleaning / Changing Fuel FilterClean gauze filter in engine feed pump Clean gauze filter in water separatorIsuzu Part No 8970631550 Draining Water from Fuel Tank Long-term Storage Storage ProceduresStacking Troubleshooting Ask our distributor to repair Page Generator Wiring Diagram Engine Wiring Diagram