DCA-125USJ (50 HZ)— GENERATOR START-UP PROCEDURE (MANUAL)
WARNING: | 4. Close all engine enclosure doors (Figure 40). |
The engine's exhaust contains harmful emissions. ALWAYS have adequate ventilation when operating. Direct exhaust away from nearby personnel.
Before Starting
CAUTION:
NEVER! manually start the engine with the main, GFCI or auxiliary circuit breakers in the ON (closed) position.
1.Place the main,G.F.C.I. and aux. circuit breakers (Figure 39) in the OFF position prior to starting the engine.
Figure 39. Main, Aux. and GFCI
Circuit Breakers (OFF)
2.Connect the load to the receptacles or the Output Terminal Lugs as shown in Figure 13. These load connection points can be found on the output terminal panel and the output terminal panel’s hard wire hookup panel.
3.The output terminal lugs are protected by a plastic cover. Remove this cover to gain access to the terminals. Tighten terminal nuts securely to prevent load wires from slipping out.
Figure 40. Engine Enclosure Doors
5.Place the voltage selector switch in the desired voltage position (Figure 41).
Figure 41. Voltage Selector
Switch
PAGE 38 —