Kohler 16EFOZ/20EOZ, 8.5EFOZ, 9EFOZ/10EOZ, 80EFOZ/99EOZ, 6.5EFOZ/8EOZ Electrical System TP-6069 6/03

Page 32

10.Connect the side of the circuit breaker marked LOAD to the ship-to-shore switch or craft wiring. Attach insulation boots to the black leads if the kit includes insulation boots. With a single-pole circuit breaker use one black lead (L1). With a two-pole circuit breaker use two black leads, L1 and L2. Connect the neutral (white) lead to the L0 stud. Connect the equipment ground (green) lead to GRD stud.

Note: Wire material. Use stranded copper for all wiring. Use wire gauges and insulation, conductor temperature ratings, sheath stripping, conductor support and protection, conductor terminals and splices, and overcurrent protection (circuit breakers, fuses) that conform to standards and codes.

Note: Follow USCG Regulations CFR33, Part 183 (Pleasurecraft) and CFR46 (Commercial Craft) for marine applications.

Note: Wire protection. Use rubber grommets and cable ties as necessary to protect and secure wiring from sharp objects, the exhaust system, and any moving parts.

11.Replace the controller cover or circuit breaker box access panel.

12.Reconnect the generator set engine starting battery, negative (--) lead last.

13.Make voltage or frequency adjustments according to Section 8.

Note: Voltage/frequency adjustable. Some four-lead generator sets are not voltage/frequency adjustable. To determine adjustment possibilities, check the model’s specification sheet or service manual. If you are reconnecting the generator set from a single-voltage to a dual-voltage configuration (example: from 120-volt to 120/240-volt) or a dual voltage to a single voltage (example: from 120/240-volt to 120-volt) with the same primary voltage, do not adjust the voltage/frequency adjustment. Adjust the voltage/frequency for frequency changes or setting changes of the primary voltage (example: from 120-volt to 100-volt). Refer to the model’s specification sheet for reconnection capability.

6.2.3Circuit Breaker Installation (33--125EFOZ and 40--150EOZ Models)

1.Place the generator set master switch in the OFF position.

2.Disconnect the generator set engine starting battery, negative (--) lead first.

3.Remove the six screws from the right side junction box panel and remove the panel.

4.Install the circuit breaker on the new panel with the screws and washers. Position the ON side of the circuit breaker toward the rear of the junction box. See Figure 6-4.

5.Attach stator leads L1, L2, and L3 to the extension leads (if supplied) or to the line side of the circuit breaker. See Figure 8-5.

Note: Insulate leads with electrical tape after connecting extension leads to stator leads.

6.Connect the neutral connection stator leads to the L0 stud.

Note: Verify that terminal positions and previously made line lead connections allow room for load connections to load studs.

7.Connect the load side of the circuit breaker to customer-supplied craft wiring. Connect the neutral lead to the L0 stud. See Figure 8-5.

8.Attach the new panel to the junction box using the original six screws. See Figure 6-4.

9.Check that the generator set master switch is in the OFF position. Reconnect the generator set engine starting battery, negative (--) lead last.

22 Section 6 Electrical System

TP-6069 6/03

Image 32
Contents Models TP-6069 6/03dPage Table of Contents Page Accidental Starting Safety Precautions and InstructionsBattery Engine Backfire/Flash Fire Exhaust SystemHazardous Voltage/ Electrical Shock Fuel SystemHazardous Noise Hot Parts Hot coolant and steam Can cause severe injury or deathMoving Parts VI Safety Precautions and Instructions TP-6069 6/03 Introduction Typical Generator Set Location and MountingIntroduction TP-6069 6/03 Installation Location Considerations Location and MountingGeneral Considerations LocationLocation and Mounting TP-6069 6/03 Cooling System VentilationCooling System Components Intake Through-Hull Strainer Seacock CoverSeacock Seawater StrainerWater Lines Closed Heat Exchanger 125EFOZ/5--150EOZ ModelsArrow Description 40--150EOZ Models Direct Water-Cooled Cooling System 3.5EFOZ and 4EOZ Models Cooling System TP-6069 6/03 Exhaust Lines Exhaust SystemTypes Exhaust System Location, Mounting, and Installation Above-Waterline InstallationTypical Above-Waterline Installation 2 Mid/Below-Waterline Installation Typical Mid and Below Waterline Installation Exhaust System TP-6069 6/03 Fuel System Fuel TankFuel Lines Fuel FiltersFuel Pump Lift Fuel ConsumptionElectrical System AC Voltage ConnectionsCircuit Protection Circuit Breaker ConsiderationsAC Circuit Breaker Ratings 33--150 kW Circuit Breaker Installation 27EFOZ and 5--32EOZ Models Electrical System TP-6069 6/03 Installation In Steel or Aluminum Vessels Installation RegulationsPleasurecraft Installation Regulations Commercial Vessel Installation RegulationsWiring CCARemote Start Switch Connection Remote Controller and Harness Options 33--150 kW Models 10 Remote Controller and Harness Options 33--150 kW Models Electrical System TP-6069 6/03 Installation Drawings Installation DrawingsDimension Drawing, 3.5EFOZ/4EOZ Remote Options, 3.5EFOZ/4EOZ Dimension Drawing, 4EFOZ/5EOZ Dimension Drawing, 4EFOZ/5EOZ with Sound Shield Dimension Drawing, 6.5EFOZ/8EOZ Dimension Drawing, 6.5EFOZ/8EOZ with Sound Shield Dimension Drawing, 8.5/9EFOZ and 10EOZ Dimension Drawing, 8.5/9EFOZ and 10EOZ with Sound Shield 10 Dimension Drawing, 11EFOZ/13EOZ 11 Dimension Drawing, 11EFOZ/13EOZ with Sound Shield 12 Dimension Drawing, 11.5/13EFOZ and 14/15.5EOZ ADV-6513B-C 14 Dimension Drawing, 16/17.5EFOZ and 20EOZ ADV-6481B-D 16 Dimension Drawing, 19/20EFOZ and 23/24EOZ ADV-6494B-C 18 Dimension Drawing, 23/27EFOZ and 28/32EOZ ADV-6285B-F 20 Dimension Drawing, 33EFOZ/40EOZ ADV-6581B-E 22 Dimension Drawing, 33EFOZ/40EOZ with Sound Shield 23 Dimension Drawing, 33EFOZ/40EOZ with Electric Clutch 24 Dimension Drawing, 40EFOZ/50EOZ ADV-6582B-E 26 Dimension Drawing, 40EFOZ/50EOZ with Sound Shield 27 Dimension Drawing, 40EFOZ/50EOZ with Electric Clutch 28 Dimension Drawing, 55EFOZ/65EOZ ADV-6583B-E 30 Dimension Drawing, 55EFOZ/65EOZ with Sound Shield 31 Dimension Drawing, 55EFOZ/65EOZ with Electric Clutch 32 Dimension Drawing, 70/80EFOZ and 80/99EOZ ADV-6603B-D ADV-6603C-D ADV-6603D-D 36 Dimension Drawing, 100/125EFOZ and 125/150EOZ ADV-6594B-D ADV-6594C-D Reconnection/Adjustments 1 100--120-Volt Configurations2 100--120/200--240-Volt Configurations Four-Lead Reconnection3 200--240-Volt Configurations Twelve-Lead ReconnectionVoltage Adjustment Overvoltage adjustment potentiometer R41 LED4 red Marine Manual Ship-to-Shore Transfer Switch Voltage Regulator Adjustment 4-27EFOZ and 5-32EOZ Models Stab13 Governor Adjustment 4EFOZ/5EOZ shown Reconnection/Adjustments TP-6069 6/03 Appendix a Generator Selection and Wattage Requirements MotorsAppendix B Abbreviations AnsiLCB Appendix C Generator Set Output Ratings Procedure Generator OutputPage Page Page 2000, 2001, 2002, and 2003 by Kohler Co. All rights reserved