Arrow Plastic EH86S, WL86-A, VL8662-A Plan Ahead, Required Eye Goggles No Phillips Screwdriver

Page 3

PLAN AHEAD....

A3

Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.

Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.

Tools and Materials: These are some basic tools and materials you will need for the construction of your building. Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need.

Required

Eye Goggles

No. 2 Phillips Screwdriver

(With Hardened Magnetic Tip) Note: A power screwdriver or vari- able speed drill with Phillips-tip at- tachment can speed assembly by as much as 40%.

Required

 

 

• Work Gloves

Optional Time-Savers

Foundation Preparation

• Step Ladder

• Utility Knife / Scissors

• Wrench / Nut Driver

• Hammer and Nails

• Pliers

• Electric / Cordless Drill

• Spade or Shovel

• Carpenter's Level

• Square

• Hand Saw / Power Saw

• Tape Measure

• String (for squaring frame)

• Lumber and/or Concrete

Selecting and Preparing Your Site: Before assembly, you will want to decide on a location for your building. The best location is a level area with good drainage.

•Allow enough working space for ease of moving parts into position during assembly. Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside.

•Before you begin the first steps in assembling your parts, a foundation should be constructed and an anchoring system should be ready to use.

3

Image 3
Contents EH86S Before YOU Begin Required Eye Goggles No Phillips Screwdriver Plan AheadSafety First Other Tips Care & MaintenanceRoof Strengthening heavy snow load Kits AccessoriesThis WAS Left Blank Intentionally This WAS Left Blank Intentionally Foundation Foundation For Your Building97 1/2 47m Anchoring Down The Building AnchoringHardware Parts List Assembly by Key No Overlap the rear floor frames as StepFloor Frame Assemblies Place the front floor frames asOverlap the rear wall channel Frame AssembliesPlace the side wall angle, back Roof Beam AssemblyUsing the door track splice Door Track AssemblyFloor Frame Corners Position the rear corner panels atPosition a front corner panel at Fasten the rear wall channel as Fasten the door track assemblyFrames Fasten the rear wall angle asWall Panels Door Jamb Gable Assemblies Join the left and right gables Gables/BracesRoof Beams If a Roof Beef-Up Kit was Right Roof PanelFront RoofAssemblyRidge Cap Roof Trim Attach the lower door guides Door AssemblyHold the vertical door brace Put a horizontal door brace ontoRepeat steps 1 through 3 for Left door Door Installation & AdjustmentEH86-A LM86 ML86-A SA8662-A VL8662-AWL86-A