Manuals
/
Brands
/
Computer Equipment
/
Network Router
/
Cisco Systems
/
Computer Equipment
/
Network Router
Cisco Systems
OL-7821-04, SCE 1000 2xGBE manual
Please, tick the box below to download manual:
Contents
Main
Cisco SCE 1000 2xGBE Installation and Configuration Guide
Page
Page
Page
Page
Page
Page
Page
Preface
Document Revision History
Audience
Organization
The major sections of this guide are as follows:
Related Publications
Conventions
This document uses the following conventions:
Notes use the following conventions:
Cautions use the following conventions:
Obtaining Documentation
World Wide Web
Documentation CD-ROM
Ordering Documentation
Documentation Feedback
Obtaining Technical Assistance
Cisco.com
Technical Assistance Center
Contacting TAC by Using the Cisco TAC Website
Contacting TAC by Telephone
Page
Overview
The Cisco Service Control Concept
Service Control for Broadband Service Providers
Cisco Service Control Capabilities
The SCE Platform
Page
Management and Collection
Network Management
Subscriber Management
Collection
Service Configuration Management
Introduction to the SCE Platform
The SCE Platform
Front Panel
The SCE 1000 Front Panel consists of ports and LEDs as shown in the following figures and tables.
Page
Back Panel
Checking the Shipping Container Contents
SCE 1000 Component List
Page
SCE 1000 Installation Checklist
Page
Topology
Issues to Be Considered
SCE Platform Configuration
Failure Detection Mechanism
Bypass Mechanism
Functionality
Physical Installation
Bump-in-the-Wire (Inline) Topology
External Splitting (Receive-only) Topology
Redundancy
Two Platforms on Parallel Links in Bump-in-the-Wire Topology
Failure and Recovery
Physical Installation
Redundancy
Maintaining the Network Links vs Maintaining SCE 1000 Platform Functionality
Topology-Related Parameters
Connection Mode Parameter
On-Failure Mode Parameter
Link Failure Reflection Parameter
Status of the SCE 1000 After Abnormal Boot
Page
Installation and Maintenance
Preparing to Install the SCE 1000 Platform
Tools and Parts Required
Site Requirement Guidelines
Airflow
Site Requirements
Installing the SCE 1000 Platform
Installation Precautions
Installing the SCE 1000 on a Workbench or Tabletop
Rack-Mounting a SCE 1000 Platform
Attaching the Brackets to the SCE 1000
Attaching the Crossrail Supports to the Rack
Mounting the System to the Rack
Attaching a Chassis Ground Connection
Power Supply Overview
LEDs
Page
Power Supply Specifications
Removing and Replacing a Power Supply Unit
Powering Down the Power Supply Unit and Disconnecting Input Power
Powering Down an AC-Input Power Supply
Powering Down a DC-Input Power Supply Unit and Removing the DC-Input Leads
Removing the Power Supply Unit
Replacing the Power Supply Unit
Reconnecting the Power
Reconnecting AC-Input Power Supply Unit
Reconnecting DC-Input Power Supply Unit
Page
Fan Module Overview
Removing and Replacing the Fan Module
Removing the Fan Module
Replacing the Fan Module
Replacing the Battery
Connecting the Local Console
Connecting the Management Interfaces and Performing Initial System Configuration
Setting Up the Local Console
Initial System Configuration
Setup Command Parameters
Page
Page
Step 1: Configuring Initial Settings
Step 2: Configuring the Hostname
Step 3: Setting the Passwords
Step 4: Configuring Time Settings
Page
Step 5: Configuring the DNS Settings
Step 6: Configuring the RDR Formatter Destination
Step 7: Configuring Access Control Lists (ACLs)
Entry Formats
Order of Entries
Page
Step 8: Configuring SNMP
Page
Page
Step 9: Configuring the Topology-Dependent Parameters
Page
Step 10: Completing and Saving the Configuration
Page
Page
Connecting the Management Interface
Cabling the Management Port
Verifying Management Interface Connectivity
Page
Page
Connecting the line ports to the network
Cabling Diagrams
Cabling the Line Ports and Completing the Installation
Single Link: Inline Topology
Single Link: Receive-only Topology
Configuring the GBE Interface Parameters
Configuring Auto-Negotiation
Page
Configure GigabitEthernet Auto-Negotiation
Connecting the GBE Line Interface Ports
Fiber Specifications
Cabling the GBE Port
Testing Connectivity: Examining Link LEDs and Counters
Examining the LEDs
Viewing the Counters to See that the Network Traffic is Reaching the Device
Loading and Activating a Service Control Application
Basic SCE 1000 Platform Operations
Starting the SCE 1000 Platform
Checking Conditions Prior to System Startup
Starting the System and Observing Initial Conditions
Final Tests
Verifying Operational Status
Viewing the User Log Counters
Managing SCE 1000 Configurations
Viewing Configuration
Page
Saving the Configuration Settings
Recovering a Previous Configuration
Performing Complex Configurations
Rebooting and Shutting Down the SCE Platform
Rebooting the SCE Platform
Shutting Down the SCE Platform
Troubleshooting
Troubleshooting Overview
Troubleshooting Tools
CLI Commands for Troubleshooting
The User Log
The Logging System
Copying the User Log
Viewing the User Log
Clearing the User Log
Viewing the User Log Counters
Generating a File for Technical Support
Check the LEDs
SCE 1000 Operational Status
Problem Solving Using a Subsystems Approach
Identifying Startup Problems
Troubleshooting the Power Subsystem
Page
Troubleshooting the Firmware Package Installation
Troubleshooting the Management Subsystem
Page
Troubleshooting the Link Interface Subsystem
Problems in the link interface subsystem could be any of the following:
Page
Page
The External Optical Bypass Module
External Optical Bypass Functionality
The External Optical Bypass Module Front Panel
Installing the External Bypass Module
Installing the Module in a Rack
Cabling the External Optical Bypass Module
Page
Specifications
Index
A
B
C
D
G
I
L
M
N
T
V
W