Cisco Systems SCE 1000 2xGBE Connecting the Management Interfaces and Performing Initial System

Models: SCE 1000 2xGBE OL-7821-04

1 131
Download 131 pages 61.9 Kb
Page 5
Image 5
Connecting the Management Interfaces and Performing Initial System

Contents

Attaching a Chassis Ground Connection 4-10

Power Supply Overview 4-11

LEDs 4-12

Power Supply Specifications 4-14

Removing and Replacing a Power Supply Unit 4-14

Powering Down the Power Supply Unit and Disconnecting Input Power 4-15

Removing the Power Supply Unit 4-16

Replacing the Power Supply Unit 4-17

Reconnecting the Power 4-17

Fan Module Overview 4-20

Removing and Replacing the Fan Module 4-20

Replacing the Battery 4-22

Connecting the Management Interfaces and Performing Initial System

Configuration 5-1

Connecting the Local Console 5-1

Setting Up the Local Console 5-2

Initial System Configuration 5-3

Setup Command Parameters 5-3

Step 1: Configuring Initial Settings 5-6

Step 2: Configuring the Hostname 5-7

Step 3: Setting the Passwords 5-7

Step 4: Configuring Time Settings 5-8

Step 5: Configuring the DNS Settings 5-10

Step 6: Configuring the RDR Formatter Destination 5-11

Step 7: Configuring Access Control Lists (ACLs) 5-12

Step 8: Configuring SNMP 5-15

Step 9: Configuring the Topology-Dependent Parameters 5-18

Step 10: Completing and Saving the Configuration 5-20

Connecting the Management Interface 5-23

Cabling the Management Port 5-23

Verifying Management Interface Connectivity 5-24

Cabling the Line Ports and Completing the Installation 6-1

Connecting the line ports to the network 6-1

Cisco SCE 1000 2xGBE Installation and Configuration Guide

 

OL-7821-04

iii

 

 

 

Page 5
Image 5
Cisco Systems SCE 1000 2xGBE, OL-7821-04 Connecting the Management Interfaces and Performing Initial System, Configuration