Cisco Systems SCE 1000 2xGBE Installation and Maintenance, Installing the SCE 1000 Platform, 4-11

Models: SCE 1000 2xGBE OL-7821-04

1 131
Download 131 pages 61.9 Kb
Page 41
Image 41
Installation and Maintenance

C H A P T E R 4

Installation and Maintenance

This chapter explains how to install a SCE 1000 platform in a rack or in a general tabletop or workbench installation. Additionally, this chapter contains instructions for installing or replacing the power supply units and fan modules.

Warning Before you install, operate, or service the system, read the Regulatory Compliance and Safety Information for the Cisco Service Control Engine. This guide contains important safety information you should know before working with the system.

This chapter contains the following sections:

Preparing to Install the SCE 1000 Platform

4-1

Installing the SCE 1000 Platform 4-4

 

Power Supply Overview

4-11

 

Removing and Replacing a Power Supply Unit

4-14

Fan Module Overview

4-20

 

Replacing the Battery

4-22

 

Preparing to Install the SCE 1000 Platform

Before installing your SCE 1000 platform, you should consider the power and cabling requirements that must be in place at your installation site, the equipment you need to install the platform, and the environmental conditions your installation site must meet to maintain normal operation. This section guides you through the process of preparing for your SCE 1000 platform installation and the installation in a rack. The section contains the following topics:

Tools and Parts Required (on page 4-2)

Site Requirement Guidelines (on page 4-3)

Cisco SCE 1000 2xGBE Installation and Configuration Guide

 

OL-7821-04

4-1

 

 

 

Page 41
Image 41
Cisco Systems SCE 1000 2xGBE Installation and Maintenance, Preparing to Install the SCE 1000 Platform, 4-11, 4-14, 4-20