Chapter 2 Provisioning

Step by Step Installation and Initial Configuration

Version 6.4.8

CNS INTEGRATION BUS is up

Note If the Cisco CNS IE2100 appliance and the Cisco PTC Server machine are in different subnets, you must configure the Cisco CNS Integration Bus and Cisco CNS IE2100 appliance as described in the “Post Installation Configuration” section, prior to performing the following steps.

Step 5 Verify the Cisco CNS Integration Bus is running:

ptc-tme%ps -ef grep rvrd

vnm 2186

1 0 15:55:27 ?

0:00

/opt/cisco/vnm/common/tibrv/bin/rvrd -store

/opt/cisco/vnm/common/tibrv/bin/rvr

Step 6 If it isn't running (the rvrd daemon was not found), go back to the last step and start it again.

Starting the Cisco PTC Server Processes

Step 7 Go to the /opt/cisco/vnm/topodisc directory: ptc-tme%cd /opt/cisco/vnm/topodisc

Step 8 Add the network devices to the Cisco PTC Network Information Seed File (NISF) through the Cisco PTC Seed File Editor.

Refer to the “Cisco PTC Network Information Seed File” appendix in the Cisco Packet Telephony Center User Guide for a detailed description of how to add the network devices to the NISF through the Cisco PTC Seed File Editor.

Step 9 Go to the /opt/cisco/vnm/topology directory and edit the LocalStrings.properties file as follows:

a.If you plan on connecting from the Cisco PTC Server machine to the machine where the Carrier Sensitive Router (CSR) application is running, you must ensure the props.naboo_prompt variable is set to the default prompt that is used by the machine where CSR is running (the prompt you receive when you log in to the CSR machine).

b.If you plan on connecting from the Cisco PTC Server machine to the machine where the Cisco Info Center (CIC) application is running, you must ensure the props.cic_prompt variable is set to the default prompt that is used by the machine where CIC is running (the prompt you receive when you log in to the CIC machine):

ptc-tme% pwd

/opt/cisco/vnm/topology

 

 

ptc-tme% ls

 

 

LocalStrings.properties

images

topology.dtd

topology.xml

 

 

WEB-INF

resources

topology.jar

topoview.html

 

 

Cisco Internet OSS for VoIP: Infrastructure Manager Implementation Guide

2-72

OL-2706-01

 

 

Page 72
Image 72
321 Studios OL-2706-01 manual Verify the Cisco CNS Integration Bus is running, Ptc-tme%ps -ef grep rvrd