Installing a New Module (Model 5xx) 51

4Reinstall the screw on the standoff.

5Reinstall the cover and the cover screws.

CAUTION: The DIP switches should all be in the down position. The DIP switches are accessible through an opening on the side of the chassis.

Install screws

DIP switches should all be in the down position

6If the bridge/router was mounted with brackets, reinstall the brackets and remount it.

7Reconnect the power cord and all cables.

Page 51
Image 51
3Com NETBuilder SI, SuperStack II manual Installing a New Module Model 5xx