54CHAPTER 5: LOGGING ON AND PERFORMING ADMINISTRATIVE TASKS

Verifying Successful The startup process takes a few minutes. When the startup process has Startup successfully completed, the LEDs on the front panel should be on or off

as described in Table 10.

If the LEDs on your bridge/router appear different from those shown in Table 10, the bridge/router may have a problem. See Appendix A for more information.

Table 10 LED Status at Successful Startup

LED

Status

 

 

LAN

 

Link

On

Active

On

Fault

Off

WAN

 

Line Act

On

Line Error

Off

Link

On

Connect

On

Fault

Off

SERIAL

 

Link

On

Active

On

Fault

Off

SYSTEM

 

Status

All off

Fwd

Off or blinking

Power/Fault

Green

Run

On

Load

Off

Test

Off

AUX

Off

 

 

If the bridge/router is configured for an ETSI switch and there are no ISDN B channel connections, the ISDN Line Act LED is off. If a B channel is not connected, the Link and Connect LEDs are also off. The LED configuration shown in this figure occurs when all channels are connected.