10CHAPTER 2: INSTALLING THE BRIDGE

Figure 3 shows the front view of the Bridge, including the LEDs and connecting ports. It also shows the cradle, which is used to mount the Bridge to a wall or to install the Bridge on a flat surface.

Figure 3 Bridge

11a/b/g Wireless

Workgroup Bridge

Power Port

Serial Port

Ethernet Port

Cradle

Observing Safety This equipment must be installed in compliance with local and national

Precautions building codes, regulatory restrictions, and FCC rules. For the safety of people and equipment, only professional network personnel should install the Bridge.

WARNING: To comply with FCC radio frequency (RF) exposure limits, a minimum body-to-antenna distance of 20 cm (8 in.) must be maintained when the Bridge is operational.

WARNING: To avoid possible injury or damage to equipment, you must use either the provided power supply or power supply equipment that is safety certified according to UL, CSA, IEC, or other applicable national or international safety requirements for the country of use. All references to power supply in this document refer to equipment meeting these requirements.

CAUTION: The 3Com power supply (part number 61-0107-000) input relies on a 16A rated building fuse or circuit protector for short circuit protection of the line to neutral conductors.

Page 16
Image 16
3Com WL-560 manual Bridge