7-INSTALLATION AND SET-UP (continued)

7.7Preliminary Electric Check-Out

Before connecting the machine to the mains please carry out the following operations:

-Make sure that the socket is provided with a ground protection circuit and that both the mains voltage and frequency meet the indications on the name plate of the machine.

-

Check that the connection of the machine to the

 

 

1

 

mains meets the provisions of law and/or the

 

 

 

 

 

 

 

 

safety regulations in your country.

 

 

 

-

Installed power = 0,620 kW

Figure 7-23

 

-Connect the power cable (A) of the control board to an electric socket c

-Standard power supply (See Specifications).

2

7.8Check-Out Phases (For Three-Phases Only)

Procedure to be followed in order to connect correctly the position of the phases:

- Set the main switch 1 in ON (I) position

 

2 E-Stop

 

 

(Figure 7-23).

Figure 7-24

-Check that safety guard panels are clearly shuts;

-Release the emergency stop push buttons rotating them clockwise (Figure 7-24).

-Push the AUXILIARIES button 3;

-Push the RESET button 4;

-Push the START button 5;

(Figure 7-25).

Check the rotation direction of the side drive belts. In case of wrong direction of rotation operate as follows:

- Push the STOP (O) button 6 and disconnect the

3

6

5 4

 

plug (Figure 7-26).

 

 

 

-Invert two phases on the terminals of the plug;

-Repeat the above mentioned procedure.