3M 800rf INSTALLATION AND SET-UP continued, Completion of Taping Heads, One Way, Tension, Roller

Models: 800rf 40800

1 170
Download 170 pages 52.62 Kb
Page 35
Image 35

7-INSTALLATION AND SET-UP (continued)

7.9 Completion of Taping Heads

See Manual 2 for Complete Instructions:

1.Place the Upper Taping Head in a convenient working position

.2. Use Figure 7-22and tape threading label. Position the tape supply roll so the adhesive side of tape is facing the front of the taping head as it is pulled from the supply roll.

3.Attach the threading needle to the end of the roll. Guide the threading needle around the wrap roller (Position 1) then back around the one- way tension roller (Position 2).

4.Continue pulling the threading needle down and guide it between the two (2) rollers on the apply arm (Position 3).

5.Pull the threading needle down until the tape travels between the apply plate and the ears of the apply arm (Position 4) until it extends past the applying roller. When properly threaded the adhesive side of the tape should be facing the knurled rollers at position 2 and also position 3.

6.Cut away any excess tape and repeat steps for Lower Taping Head.

Important – Do not cut against the apply roller - roller damage could occur.

 

 

 

 

 

 

 

 

One Way

 

 

 

Tension

 

#2

 

Roller

 

#1

 

 

 

 

Tension

 

 

 

 

Wrap

 

 

 

 

Roller

 

 

 

 

 

 

 

 

 

Knurled

 

 

 

Roller

 

 

 

 

 

 

 

 

#3

Wrap

 

 

Roller

 

 

 

 

 

 

 

 

 

 

 

 

 

Applying

 

 

 

Roller

 

 

 

 

 

 

 

 

 

Threading

 

 

#4

Needle

 

 

Figure 7-27

 

 

 

 

 

 

 

800rf-NA

23

2012 March

Page 35
Image 35
3M 800rf INSTALLATION AND SET-UP continued, Completion of Taping Heads, One Way, Tension, Roller, Wrap, Knurled, Applying