3.Replace the twelve screws in the Upper Cover as shown.
NOTE: The red callouts are M2.5*6 screws and green callouts are M2.5*3 screws.
4.Connect the following three cables to the Mainboard.
AB
C
104 | Chapter 3 |
3.Replace the twelve screws in the Upper Cover as shown.
NOTE: The red callouts are M2.5*6 screws and green callouts are M2.5*3 screws.
4.Connect the following three cables to the Mainboard.
AB
C
104 | Chapter 3 |