Compact Station TKS-CS - Operating Instructions

7 Assembly

7.1Setting in Place

The compact station TKS-CS does not need a foundation. The concrete base serves as its foundation.

 

1

2

3

4

5

2

3

5

Figure 12 - Setting the compact station in place

 

 

1

Ground

 

 

 

4

Transport eyelets

2

Concrete base

 

 

 

5

Transport rod

 

3

Metal housing

 

 

 

 

 

 

 

Using the construction pit pin, create a construction pit on clear ground.

The system may only be installed by crane (Chapter 6 - Transport).

Remove the transport rod after the system has been installed.

Page 18 of 39

8000043213 BAL

Page 18
Image 18
AEG TKS-CS operating instructions Assembly, Setting in Place