Compact Station TKS-CS - Operating Instructions

Annually

Measuring and monitoring devices must comply with the VDE 0413 standard.

Check and calibrate all measuring instruments.

Check that the equipment as a whole is in perfect working order:

-Check housing and roof structure for damage

-Check line connections for dirt and corrosion

-Check protective covers for damage and check their fastenings

Check all input, monitoring and output values in the equipment and also in interaction with the external control system. Check the control behaviour of the equipment and readjust, correct or change the limit values if required.

Check the function of the peripheral connections, i.e. all connections of the various accessory systems, and repair them if required.

Clean the equipment to minimise creepage currents (do not use water).

Comply with BGV A3, DIN VDE 0105-100 during this process.

Check that the safety signs are complete and legible, and replace if required.

(Must be checked by an expert every 2 years.)

Check the function of the lighting in the compact station, and replace if necessary.

Every 2 years

Check of the safety signs in the operating area and in the equipment by an expert.

Every 4 years

Replace the axial ventilator and clean the weather-proof cover.

10.5Storing Spare Parts

iWhen ordering spare parts, you must provide the component designation, installation location and component number as well as the unit number of the component.

The AEG PS customer service department will be happy to send you a spare parts list on request.

8000043213 BAL

Page 35 of 39

Page 35
Image 35
AEG TKS-CS operating instructions Storing Spare Parts, Annually, Every 2 years, Every 4 years