10.2.3Functional Test
i | Always perform a functional test after completing any |
| |
| servicing work and before starting operation. |
|
|
Electrical equipment must only be started up if it is in perfect working order and must be kept in this condition.
Following repair, replacement or modification work, a functional test must be performed in accordance with the commissioning log. For repeat tests, functional testing of the equipment or its components need only be carried out to an extent that verifies the safety of the equipment.
10.2.4Testing/Measuring
The aim of testing/measuring is to verify that the electrical equipment complies with the installation standards.
In the case of recurrent tests, all measurements must be taken in accordance with the initial
i | All measuring and monitoring devices used for testing must |
comply with the standards DIN VDE 0413/EN 61557 and | |
DIN 0404, and must be tested and calibrated regularly in | |
accordance with ISO 9001:2000. | |
|
|
The equipment has various diagnostic functions (some of which are optional), which can significantly reduce the time required for maintenance work and troubleshooting.
Self-diagnosis:
This is activated when the equipment is switched on. Internal auxiliary programs monitor the bus system, the control PCBs and the sensors (amongst other things), and signal any faults that occur.
Data logger:
Measured data, parameters and fault indications are saved continuously. Measured data and performance data, as well as fault histories, can be read out and evaluated as required.
i | The operating instructions describe how to output |
| |
| performance and fault histories. |
|
|