Compact Station TKS-CS - Operating Instructions

7.2.4Central Earthing System

Connect the active earthing to the potential equalising strip according to the circuit diagram.

7.2.5Medium-Voltage System

12

Figure 15 - Medium-voltage system (example)

1Cable branch line L1/L2/L3 (left flap), external AC connections

2Transformer branch line (right flap),

internal AC connections from transformer to load interrupter switch

The MV system is preinstalled in the compact station.

Use the power cables supplied for the system AC connections, and connect in accordance with the manufacturer's installation instructions located in the system. Insert the branch cable into the compact station from below.

8000043213 BAL

Page 21 of 39

Page 21
Image 21
AEG TKS-CS operating instructions Medium-voltage system example