Allied Telesis x600-24Ts-POE manual

Models: x600-24Ts-POE

1 110
Download 110 pages 37.26 Kb
Page 81
Image 81
Manual background

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

2.Remove the transceiver from its shipping container and store the packaging material in a safe location.

3.Position the transceiver with the label facing up.

4.Slide the transceiver into the slot until it clicks into place. See Figure 40.

23R

 

 

 

 

 

 

 

 

CLASS 1

 

 

 

 

 

 

LASER

PRODUCT

 

 

 

 

 

 

 

L/A

1000

LI

 

PORT

AC

 

 

D/C

NK /

 

 

FDX

 

ACT

24R

 

 

 

 

 

 

 

 

 

 

 

 

21

 

 

 

 

 

 

 

22

 

 

 

 

 

 

 

23

 

 

 

 

 

 

 

24

 

 

 

 

 

 

 

1331

 

 

 

 

 

Figure 40. Installing an SFP Transceiver

5.For the x600-24Ts and x600-24Ts/XP switches, verify that the handle on the SFP transceiver is in the upright position, as shown in Figure 41, to prevent inadvertently removing the transceiver.

23R

 

 

 

 

 

 

 

CLASS 1

 

 

 

 

 

LASER

PRODUCT

 

 

 

 

 

 

L/A

1000

LINK /

PORT

AC

 

 

D/C

 

 

FDX

ACT

24R

 

 

 

 

 

 

 

 

 

 

21

 

 

 

 

 

 

22

 

 

 

 

 

 

23

 

 

 

 

 

 

24

 

 

 

 

 

 

1331

 

 

 

 

Figure 41. Positioning Handles on the x600-24Ts and x600-24Ts/XP

Switches

81

Page 81
Image 81
Allied Telesis x600-24Ts-POE manual