List of Figures
Figure 1. | 21 | |
Figure 2. | 22 | |
Figure 3. | 23 | |
Figure 4. | 24 | |
Figure 5. | 25 | |
Figure 6. | SFP Transceiver | 28 |
Figure 7. | XFP Transceiver | 29 |
Figure 8. | SD Card Slot | 31 |
Figure 9. SD Card | 31 | |
Figure 10. Port LEDs on | 32 | |
Figure 11. Port LEDs on | 32 | |
Figure 12. Port LEDs on | 33 | |
Figure 13. SFP LEDs - | 34 | |
Figure 14. SFP LEDs - | 35 | |
Figure 15. XFP LEDs on | 35 | |
Figure 16. System STATUS LEDs | 36 | |
Figure 17. Non PoE Switch STACK LEDs | 37 | |
Figure 18. | 37 | |
Figure 19. | Secure Digital Slot LED | 39 |
Figure 20. | 44 | |
Figure 21. | 45 | |
Figure 22. VCS Stacking Module | 46 | |
Figure 23. | 51 | |
Figure 24. VCS Ring Topology Using x600 Switches | 52 | |
Figure 25. | Resiliency link connecting to switch ports over the ResiliencyLink VLAN | 54 |
Figure 26. | Resiliency link connecting to switch ports over the ResiliencyLink VLAN using a network hub | 54 |
Figure 27. STACK and STATUS LEDs | 58 | |
Figure 28. | Power Cord Retaining Clip | 68 |
Figure 29. | Inserting the Retaining Clip into the Retaining Bracket | 68 |
Figure 30. Removing the Feet | 69 | |
Figure 31. | Attaching | 69 |
Figure 32. | Mounting the Switch in a Rack | 70 |
Figure 33. | Resetting the Switch | 71 |
Figure 34. VC Stacking | 72 | |
Figure 35. | Removing the Blank Panel from the Expansion Slot | 73 |
Figure 36. | Installing the | 74 |
Figure 37. Securing the | 74 | |
Figure 38. | Removing the Plastic Protector | 75 |
Figure 39. Removing a Dust Plug from an SFP Slot | 80 | |
Figure 40. | Installing an SFP Transceiver | 81 |
Figure 41. Positioning Handles on the | 81 | |
Figure 42. Positioning SFP Handles on the | 82 | |
Figure 43. Removing an XFP Dust Plug | 83 | |
Figure 44. | Installing an XFP Transceiver | 83 |
Figure 45. | Power Cord Retaining Clip in the Up Position | 86 |
Figure 46. Connecting the AC Power Cord | 86 | |
Figure 47. Connecting the Management Cable to the | 87 | |
Figure 48. | 104 | |
Figure 49. | 106 | |
Figure 50. | 108 |
9