I N S T A L L A T I O N

SITE INSTALLATION

TROLLEY GUIDE INSTALLATION

Trolley Guide Installation

1.Align each guide rail with the holes located under the cabinet.

2.Loosely fasten each guide rail with a washer, lock washer and bolt.

3.Push the roll-in cart (trolley) into the Quickchiller, center the cart right-to-left, and close the door.

4. Slide both guide rails toward the center of the Quickchiller until they make contact with the roll-in cart. Lock the guide rails into position by tightening the bolts. At the front of the Quickchiller, make certain contact has been made between the Quickchiller and the cart along the total width of the door to create a complete seal. When a full seal has been determined, recheck each connection to make certain it has been fully tightened.

QUICKCHILLER • INSTALLATION/OPERATION/SERVICE MANUAL • 5 .

Page 7
Image 7
Alto-Shaam QC-3/QC-20/QC-40/QC-50/QC-50 Remote/QC-100/Qc-100 Remote manual Trolley Guide Installation