SECTION IV
OPERATING INSTRUCTIONS
The Phase 7
NOTE: Refer to Section III of this manual for a complete explanation of the various cycles/selections available.
After the load is put into the basket (tumbler) and the dryer is ready to dry, determine which cycle will best suit the application (type of load). We recommend using the Automatic Drying Cycle (Patent No. 4,827,627) for most loads. This cycle provides for the best drying in the shortest time, automatically.
A. OPERATING SEQUENCE
1.Preprogrammed Cycles
a. Automatic Drying Cycle (Patent No. 4,827,627)
1)Light emitting diode (L.E.D.) display reads “READY” (no cycle in progress).
2)Press the letter on the keyboard (touch pad) corresponding to the cycle desired (i.e., key “A”).
NOTE:
3)The dryer will then start. (I.E., blower, basket [tumbler], and heat).
4)At the start of a cycle, the L.E.D. display will initially display the cycle parameters of the selected cycle, AUTO DRYING CYCLE A, TEMP 180, DRYNESS LEVEL EX DRY. Then the display will read AUTO CYCLE A, ELAPSED TIME 00:00 MINUTES. The L.E.D. display will continue to show AUTO CYCLE A, ELAPSED TIME XX:XX MINUTES until the load is dried to the appropriate dryness level or the auto cycle time out time has expired.
NOTE: Press and hold the “UPARROW” to view the basket (tumbler) temperature at any time.
NOTE: The dryer can be stopped at any time by pressing the “STOP/CLEAR” key; at this time, the dryer will go into a cycle pause. If the “STOP/CLEAR” key is pressed again at this point, the cycle that was in progress will be cancelled and returned to the “READY” state.
5)Once the preprogrammed percentage of extraction (dryness level) is reached, the drying cycle will end and the Cool Down Cycle will begin.
14