Battery Operation

During battery operation, the load is supported by the inverters. The inverters are supplied by battery power, ensuring uninterrupted support to the load.

While the UPS is running in battery operation, a single-line diagram will appear on the screen with a green line indicating the power flow from the batteries through the main inverter to the load for as long as the batteries are energized.

CAUTION!

Do not open Q2, Q7 or Q8 when the UPS is in battery operation, as this action may result in a load drop or a failure of the UPS to support the load.

Bypass Static Switch

Delta inverter

Main inverter

Battery

Breaker Identification

Q1

UPS input breaker

Q5

Static bypass input breaker

 

 

 

 

Q2

UPS output breaker

Q7

Battery breaker 1

 

 

 

 

Q3

Manual bypass breaker

Q8

Battery breaker 2

 

 

 

 

Only operate a breaker when the associated breaker lamp is on.