Manuals
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
PD150L6F, PD150G6F
manual
Models:
PD150L6F
PD150G6F
1
82
84
84
Download
84 pages
32.8 Kb
77
78
79
80
81
82
83
84
<
>
Specs
Install
Alarm Relay Map
Password
Factory Defaults
Warranty
Config
Problem Action
Total power off procedure
APC Three-Phase Systems
Page 82
Image 82
Page 81
Page 83
Page 82
Image 82
Page 81
Page 83
Contents
150kW InfraStruXure PDU
Page
About this Manual
Page
Contents
Operation
Customizing and Updating the PDU
Product Information
Cross-reference symbols used in this manual
Safety symbols used in this manual
Overview
Installation/maintenance
Receiving/moving
Total power off procedure
Emergency Power Off EPO
EMI
Overview
InfraStruXure PDU Components
InfraStruXure PDU
Front view
Front view interior
Rear view
Rear view interior
PDU monitoring unit
Left = 43..83 lower right =
User connection plate
PDU Display Interface
Top-level menu screen
Top-level status screens
Navigating through screens
Password-protected screens
Power Factor
Load-Meter Screen
Volt-Meter Screen
Open or Closed
Contacts Screen
Input Contacts
Relay Outputs
Alarm Relay Map
How to connect contacts to the PDU monitoring unit
Breakers Screen
Main Input
Entire Log
Alarms Screen
New Logged Items
Clear Log
Loading Limits
Global Alarm
Config
Voltage Limits
PDU Alarms
Alarm Condition Explanation
Branch Ckt Loading
Panel Screen
Branch Ckt Limits
Circuit breakers occupying positions 08, 10, and 12 on
Panel Configuration
Top right distribution panel
Global Panel Config
Beeper Volume Select High , Medium , Low , or Off to adjust
Config Screen
System Password
Date/Time
Output Config
Electrical Config
Input Config
Manufacturer Data
Firmware Updates
Factory Defaults
System ID
How to Apply Power to the System
Operation
Operation How to Apply Power to the System
How to Ensure Total Power Off
Page
InfraStruXure Manager
InfraStruXure PDU Management Options
Overview
Network management interfaces
Configuring the InfraStruXure Manager
Connect the InfraStruXure PDU to the InfraStruXure Manager
Configuration Overview
Configuring the Network Management Interface
Connect the InfraStruXure PDU to your network
TCP/IP configuration methods
Device IP Configuration Wizard
Bootp & Dhcp configuration
Option 43 = 01 04 31 41 50 43 where
150kW InfraStruXure PDU-Operation and Configuration
Use apc for the User Name and Password
Local access to the control console
Remote access to the control console
Control console
Use apc for both User Name and Password
Choose Network from the Control Console menu
Web interface
Snmp
FTP and SCP
150kW InfraStruXure PDU-Operation and Configuration
Page
Important Safety Instructions
Customizing and Updating the PDU
PDU Orderable Part List
Breakers
Customizing and Updating the PDU
Add a power cable to the PDU
How to Add Circuit Breakers and Power Cables
Add a circuit breaker on the PDU
Customizing and Updating the PDU
Overview
How to attach the circuit breaker to the mounting brackets
How to connect the sub-feed cable to the circuit breaker
ATS 0 ATS 1 ATS Atsen
How to connect contacts to the PDU monitoring unit
How to Connect an EPO Switch to the PDU and Test the Switch
Contact closure 24VAC 24VDC Contact closure is recommended
Contact Closure-Normally Closed
Contact Closure-Normally Open
24VAC/VDC-Normally Open
Problem Action
Safety warnings
How to Download Firmware Updates
From a local computer
Page
Specifications
150kW InfraStruXure PDU
Physical PD150G6F PD150L6F
Warranty
InfraStruXure Standard Warranty
Product Information Warranty
APC Three-Phase Systems
Life-Support Policy
How to Obtain Service
How to contact APC
Index
SSH
Page
Page
Page
990-1984
Top
Page
Image
Contents